# Site report — 53.39044, -6.40543

*Everything within 1000 m, generated 2026-09-15 from the PlanSight store. No figure in this report was fetched live; each section names its source and the date that source was last confirmed.*

> **What closes soonest**
>
> - **2026-09-17** (2 days) — appeal: FW26A/0260E: GRANT PERMISSION — Amendment to previously permitted development Ref. FW24A/0315E compris
> - **2026-09-22** (7 days) — observation: FW26A/0324E: application received — The development consists of the retention of first-floor storage areas
> - **2026-09-23** (8 days) — observation: FW26A/0325E: application received — Retention of the single storey timber structure, in use as a sauna/ste


## Where this is

|  |  |
|---|---|
| Townland | Coolmine |
| Settlement | Dublin city and suburbs |
| Electoral division | Blanchardstown-Coolmine |
| Local electoral area | Castleknock |
| Local authority | Fingal County Council |

**Census 2022, small area 267029005** — 258 people in 90 households (92 dwellings). 43.3% owner-occupied, 48.9% privately rented, 41.1% social. Vacancy 2.2%. 1. Cities

*Sources: [places](https://services-eu1.arcgis.com/FH5XCsx8rYXqnjF5/arcgis/rest/services/Administrative_Areas___OSi_National_Statutory_Boundaries/FeatureServer/0) (2026-09-11)*

## The site itself

**Parcel** — Tailte Éireann `1816798` (freehold), 7,945.02 m² (0.79 ha), FINGAL.

**Zoning**

| Code | Objective | Plan |
|---|---|---|
| — | LC - Local Centre: Provide a mix of local community and commercial facilities for the existing and developing communiti… | FINGAL_DP_OWN |
| M3 | LC - Local Centre: Protect, provide for and/or improve local centre facilities | Fl-001:DP:the-fingal-development-plan-2023-2029 |

**Residential Zoned Land Tax** — this site is not on an RZLT map. 342 mapped parcel(s) within the radius.

**Constraints within 1,000 m**

| Designation | Count | Examples |
|---|---|---|
| Radon risk area | 5 | About 1 in 10 homes in this area is likely to have high radon levels; About 1 i… |
| Record of Protected Structures | 1 | Coolmine Church (in ruins) |
| Recorded monument | 3 | Church; Graveyard; R149695 |

*Sources: [parcels](https://services-eu1.arcgis.com/FH5XCsx8rYXqnjF5/arcgis/rest/services/Cadastral_Parcels_Freehold/FeatureServer/12) (2026-09-11)*

## Planning activity — 215 applications within 1,000 m in 5 years

| Decision | Applications |
|---|---|
| GRANT PERMISSION | 127 |
| GRANT PERMISSION FOR RETENTION | 20 |
| Invalid Application | 18 |
| REFUSE PERMISSION FOR RETENTION | 12 |
| REFUSE PERMISSION | 9 |
| INVALID APPLICATION DUE TO SITE NOTICE | 8 |
| REFUSE PERMISSION & REFUSE RETENTION | 8 |
| GRANT PERMISSION & GRANT RETENTION | 5 |
| (undecided) | 4 |
| App withdrawn as no AI recd in 6 months | 3 |
| REQUEST ADDITIONAL INFORMATION | 1 |

### Open for observations now

| Closes | Days | Ref | What | Distance |
|---|---|---|---|---|
| 2026-09-22 | 7 | [FW26A/0324E](https://planning.agileapplications.ie/fingal/application-details/?ref=FW26A/0324E) | The development consists of the retention of first-floor storage areas | 784.2 m |
| 2026-09-23 | 8 | [FW26A/0325E](https://planning.agileapplications.ie/fingal/application-details/?ref=FW26A/0325E) | Retention of the single storey timber structure, in use as a sauna/ste | 766.8 m |

### Largest by unit count

| Units | Ref | Status | Decision | Received | What |
|---|---|---|---|---|---|
| 0 | FW26A/0325E | Referral | — | 2026-08-19 | Retention of the single storey timber structure, in use as a sauna/ste |
| 0 | FW26A/0324E | Referral | — | 2026-08-18 | The development consists of the retention of first-floor storage areas |
| 0 | FW26A/0309E | Referral | — | 2026-07-31 | The development will consist of an amendment to the granted planning p |
| 0 | FW26A/0306 | Invalid Application | Invalid Application | 2026-07-28 | Change of Use Planning Permission from a conveyance market to a deli t |
| 0 | FW26A/0296E | 35 Day Assessment | — | 2026-07-22 | The construction of a single-story cabin in the rear garden and all as |
| 0 | FW26A/0260E | Decision Issued | GRANT PERMISSION | 2026-06-30 | Amendment to previously permitted development Ref. FW24A/0315E compris |
| 0 | FW26A/0247E | Decision Issued | REFUSE PERMISSION | 2026-06-17 | The development will consist of façade upgrade works comprising the in |
| 0 | FW26A/0242E | Decision Issued | GRANT PERMISSION | 2026-06-12 | We, Blanche Retail Nominee Limited, intend to apply for planning permi |
| 0 | FW26A/0208E | Final Grant | GRANT PERMISSION | 2026-05-22 | Conversion of existing attic space comprising of modification of exist |
| 0 | FW26A/0187E | Final Grant | GRANT PERMISSION | 2026-05-08 | the conversion of existing attic space to include a Hip to Gable Conve |

### Most recent

| Received | Ref | Status | Distance | What |
|---|---|---|---|---|
| 2026-08-19 | FW26A/0325E | Referral | 766.8 m | Retention of the single storey timber structure, in use as a sauna/ste |
| 2026-08-18 | FW26A/0324E | Referral | 784.2 m | The development consists of the retention of first-floor storage areas |
| 2026-07-31 | FW26A/0309E | Referral | 299.5 m | The development will consist of an amendment to the granted planning p |
| 2026-07-28 | FW26A/0306 | Invalid Application | 26.9 m | Change of Use Planning Permission from a conveyance market to a deli t |
| 2026-07-22 | FW26A/0296E | 35 Day Assessment | 227.6 m | The construction of a single-story cabin in the rear garden and all as |
| 2026-06-30 | FW26A/0260E | Decision Issued | 266.5 m | Amendment to previously permitted development Ref. FW24A/0315E compris |
| 2026-06-17 | FW26A/0247E | Decision Issued | 877.8 m | The development will consist of façade upgrade works comprising the in |
| 2026-06-12 | FW26A/0242E | Decision Issued | 818 m | We, Blanche Retail Nominee Limited, intend to apply for planning permi |
| 2026-05-22 | FW26A/0208E | Final Grant | 456 m | Conversion of existing attic space comprising of modification of exist |
| 2026-05-08 | FW26A/0187E | Final Grant | 819.4 m | the conversion of existing attic space to include a Hip to Gable Conve |

*`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.*

*Sources: [npad](https://services.arcgis.com/NzlPQPKn5QF9v2US/ArcGIS/rest/services/IrishPlanningApplications/FeatureServer) (2026-09-14)*

## Appeals — 35 in 5 years

| Outcome | Cases |
|---|---|
| grant_conditions | 12 |
| (pending) | 6 |
| refuse | 6 |
| invalid | 5 |
| other | 3 |
| withdrawn | 2 |
| grant | 1 |

| Decided | ACP ref | LA ref | Outcome | Distance |
|---|---|---|---|---|
| 2026-08-24 | 501944 | FW26A/0075E | open | 889.3 m |
| 2026-08-24 | 501945 | FW26A/0075E | open | 889.3 m |
| 2026-08-21 | 500216 | FW25A/0249E | grant | 36.3 m |
| 2026-08-19 | 501541 | FW25A/0428E | withdrawn | 922.4 m |
| 2026-05-12 | 500720 | FW25A/0484 | refuse | 763.8 m |
| 2026-05-08 | 501304 | FW26A/0068E | pending | 267.4 m |
| 2026-05-05 | 501289 | FW26A/0068E | invalid | 267.4 m |
| 2025-12-10 | 500444 | FW25A/0410E | pending | 618.6 m |
| 2025-11-26 | 323259 | FW25A/0227E | grant_conditions | 624.4 m |
| 2025-07-08 | 322975 | FW25A/0164E | invalid | 267.5 m |

*Sources: [acp](https://services-eu1.arcgis.com/o56BSnENmD5mYs3j/arcgis/rest/services/Cases_2016_Onwards/FeatureServer/3) (2026-09-11)*

## What is actually being built — 48 commencement notices in 3 years

| Year | Notices |
|---|---|
| 2026 | 17 |
| 2025 | 17 |
| 2024 | 13 |
| 2023 | 1 |

| Date | Address | Kind | Planning ref | Distance |
|---|---|---|---|---|
| 2026-09-15 | 10 Inglewood Close, Dublin 15, Dublin, D15 RRC6 | short_commencement_notice | FW26A/0208E | 468.1 m |
| 2026-09-14 | 80 Castlefield Woods, Dublin 15, Dublin, D15 X76F | short_commencement_notice | F25A/0426 | 801.8 m |
| 2026-09-07 | 23 Sorrel Dale, Dublin 15, Dublin, D15 XD7Y | short_commencement_notice | FW25A/0378E | 584.2 m |
| 2026-08-29 | 41 Lohunda Crescent, Dublin 15, Dublin | commencement_notice | FW25A/0381E | 357.9 m |
| 2026-07-27 | Coolmine Community School, Dublin | seven_day_notice | — | 673.4 m |
| 2026-07-23 | 17 Shelerin Road, Dublin 15, Dublin, D15 E0Y9 | short_commencement_notice | FW25A/0227E | 661 m |
| 2026-07-13 | 8 Castlefield Park, Dublin | opt_out_commencement_notice | FW24A/0458E | 947.2 m |
| 2026-07-13 | 10 Willow Wood View, Dublin 15, Dublin, D15 HKF1 | opt_out_commencement_notice | FW23A/0281 | 738.6 m |
| 2026-06-10 | 29 Sorrel Heath, Clonsilla, Dublin, D15 Y5T6 | opt_out_commencement_notice | — | 616.3 m |
| 2026-06-04 | Blanchardstown Road South, Dublin, D15 T1FD | seven_day_notice | FW25A/0349E | 963.9 m |

*One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).*

*Sources: [bcms](https://data.nbco.gov.ie/dataset/2704a333-874d-46f5-b3bc-3673766bf816/resource/0774e781-7af8-46da-b623-872e74cf541e/download/buildingscnscccs.csv) (2026-09-14)*

## Recent sales — 127 within 1,000 m

Median €410,000 (range €210,000 – €635,000), median €4,647/m².

127 matched to the exact address; 43 with beds, floor area and BER from the matched daft.ie advertisement.

| Sold | Price | Address | Beds | m² | BER | New build |
|---|---|---|---|---|---|---|
| 2026-08-11 | €402,000 | 1 WOODVALE CRESCENT, CLONSILLA, DUBLIN 15 | — | — | — | no |
| 2026-07-02 | €383,000 | 5 WHITECHAPEL LAWN, CLONSILLA, DUBLIN 15 | — | — | — | no |
| 2026-05-06 | €480,000 | 22 SHELERIN RD, CLONSILLA, DUBLIN 15 | 3 | 100.5 | C3 | no |
| 2026-04-10 | €487,000 | 29 LOHUNDA DOWNS, CLONSILLA, DUBLIN 15 | 4 | 99 | C2 | no |
| 2026-03-02 | €550,000 | WEAVER'S ROW, CLONSILLA ROAD, CLONSILLA | 2 | — | — | no |
| 2026-01-13 | €535,000 | 19 INGLEWOOD CRESCENT, CLONSILLA, DUBLIN 15 | 4 | 114 | E1 | no |
| 2025-12-09 | €542,000 | 5 CASTLEFIELD PARK, CLONSILLA, DUBLIN 15 | 4 | 120 | D1 | no |
| 2025-12-02 | €350,000 | 72 VERDMONT, SHUBOROUGH RD, DUBLIN 15 | — | — | — | no |
| 2025-11-18 | €375,000 | 14 WOODVALE CRESCENT, CLONSILLA, DUBLIN 15 | 3 | 81 | E1 | no |
| 2025-11-14 | €565,000 | 17 LIMELAWN WOOD, CLONSILLA, DUBLIN 15 | 4 | 117.5 | C3 | no |

*PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).*

*Sources: [cara_listings](https://www.daft.ie/ (via Cara `daft_listing`)) (2026-09-11); [daft_gateway](https://gateway.daft.ie/old/v1/listings) (2026-09-14); [ppr](https://www.propertypriceregister.ie/website/npsra/pprweb.nsf/PPRDownloads?OpenForm) (2026-09-14)*

## Open consultations

| Closes | Days | Title | Kind |
|---|---|---|---|
| 2026-09-15 | 0 | [Fingal Safer Schools - St. Fintan's National School, Sutton, Dublin 13](https://consult.fingal.ie/en/consultation/fingal-safer-schools-st-fintans-national-school-sutton-dublin-13) | other |
| 2026-09-15 | 0 | [Fingal Safer Schools - Scoil Mhuire, Howth Primary School, Tuckett's Lane, Howth](https://consult.fingal.ie/en/consultation/fingal-safer-schools-scoil-mhuire-howth-primary-school-tucketts-lane-howth) | other |
| 2026-09-15 | 0 | [Fingal Safer Schools - Hansfield Educate Together National School, Barnwell Roa…](https://consult.fingal.ie/en/consultation/fingal-safer-schools-hansfield-educate-together-national-school-barnwell-road-clonee-dublin-15) | other |
| 2026-09-15 | 0 | [Fingal Safer Schools - St Mochta's National School, Porterstown Road, Clonsilla…](https://consult.fingal.ie/en/consultation/fingal-safer-schools-st-mochtas-national-school-porterstown-road-clonsilla-dublin-15) | other |
| 2026-09-20 | 5 | [Fingal Safer Schools - Gaelscoil na Mara & Donabate Community College, Portrane…](https://consult.fingal.ie/en/consultation/fingal-safer-schools-gaelscoil-na-mara-donabate-community-college-portrane-road-ballisk-common) | other |
| 2026-09-20 | 5 | [Fingal Safer Schools - St. Mary's National School, R122, Oldtown, Co. Dublin](https://consult.fingal.ie/en/consultation/fingal-safer-schools-st-marys-national-school-r122-oldtown-co-dublin) | other |
| 2026-09-20 | 5 | [Fingal Safer Schools - Swords Educate Together National School & Gaelscoil Bhri…](https://consult.fingal.ie/en/consultation/fingal-safer-schools-swords-educate-together-national-school-gaelscoil-bhrian-b%C3%B3roimhe-glen-ellan) | other |
| 2026-09-20 | 5 | [Fingal Safer Schools - Thornleigh Educate Together National School, Thornleigh …](https://consult.fingal.ie/en/consultation/fingal-safer-schools-thornleigh-educate-together-national-school-thornleigh-green-swords) | other |
| 2026-09-25 | 10 | [Public Consultation on Identification of Bathing Waters in Fingal for Bathing S…](https://consult.fingal.ie/en/consultation/public-consultation-identification-bathing-waters-fingal-bathing-season-2027) | other |

*Sources: [consult](https://dlrcoco.citizenspace.com | https://consult.fingal.ie | https://engage.dublincity.ie) (2026-09-12)*

## Council decisions nearby

| Meeting | Committee | Kind | Item |
|---|---|---|---|
| 2026-09-14 | County Council | other | [Notice of proposed lease of land at Kellystown, Dublin 15 to St. Mochta's Footb…](https://meetings.fingal.ie/ieListDocuments.aspx?CId=129&MId=6295#AI109767) |
| 2026-09-14 | County Council | other | [Report of Blanchardstown-Mulhuddart/Castleknock/Ongar Services B Area Committee…](https://meetings.fingal.ie/ieListDocuments.aspx?CId=129&MId=6295#AI109183) |
| 2026-09-03 | Blanchardstown-Mulhuddart/Castleknock/O… | motion | [Councillor T. Leddy - Castleknock Village Heritage Strategy - AI109092](https://meetings.fingal.ie/ieListDocuments.aspx?CId=139&MId=6305#AI109092) |
| 2026-09-03 | Blanchardstown-Mulhuddart/Castleknock/O… | other | [Councillor S. Shovlin - Update on Engagement regarding Broadband in Castleknock…](https://meetings.fingal.ie/ieListDocuments.aspx?CId=139&MId=6305#AI109166) |
| 2026-09-03 | Blanchardstown-Mulhuddart/Castleknock/O… | other | [Councillor G. Sheehan - Clonee to Blanchardstown Cycling Route - AI108792](https://meetings.fingal.ie/ieListDocuments.aspx?CId=139&MId=6305#AI108792) |
| 2026-09-03 | Blanchardstown-Mulhuddart/Castleknock/O… | other | [Councillor G. Sheehan - Update on Junction Upgrade at Hartstown Road/Huntstown …](https://meetings.fingal.ie/ieListDocuments.aspx?CId=139&MId=6305#AI109561) |
| 2026-09-03 | Blanchardstown-Mulhuddart/Castleknock/O… | other | [Email from Rachel Begley TII dated 29th May 2026 regarding Cllr Walsh Motion Im…](https://meetings.fingal.ie/ieListDocuments.aspx?CId=139&MId=6305#AI108955) |
| 2026-09-03 | Blanchardstown-Mulhuddart/Castleknock/O… | s183_disposal | [Proposed lease of land at Kellystown, Dublin 15 to St Mochta's Football Club, P…](https://meetings.fingal.ie/ieListDocuments.aspx?CId=139&MId=6305#AI109599) |
| 2026-09-03 | Blanchardstown-Mulhuddart/Castleknock/O… | other | [Confirmation and Re-Affirmation of Minutes of Blanchardstown - Mulhuddart/Castl…](https://meetings.fingal.ie/ieListDocuments.aspx?CId=139&MId=6305#AI107824) |
| 2026-09-03 | Blanchardstown-Mulhuddart/Castleknock/O… | motion | [Councillor T. Leddy - M50 Boundary with Castleknock Tennis Club - AI109273](https://meetings.fingal.ie/ieListDocuments.aspx?CId=139&MId=6305#AI109273) |

*Sources: [moderngov](https://meetings.fingal.ie) (2026-09-14)*

## Infrastructure and public land

*70 capacity record(s) nearby (esb_substation) are not reproduced: source licence forbids redistribution; see the operator's own register.*

**Public land** — 39 relevant public land site(s) nearby: An Post (2), Dublin City Council (8), Electricity Supply Board (1), Fingal County Council (21), Health Service Executive (1), The Minister for Education and Skills (6)

*Sources: [esbn](https://www.esbnetworks.ie/services/get-connected/renewable-connection/network-capacity-heatmap) (2026-09-11)*

## Schools and transport within 1,000 m

| School | Distance |
|---|---|
| ST PHILIP THE APOSTLE JUNIOR N S | 109.1 m |
| ST PHILIPS SENIOR N S | 141.5 m |
| SN OILIBHEIR | 611.6 m |
| Blakestown Community School | 637.5 m |
| Scoil Phobail Chuil Mhin | 673.4 m |
| SCOIL NAIS MHUIRE SOIS | 843.7 m |
| SCOIL MHUIRE SIN | 903.6 m |
| S N NAOMH MOCHTA | 939.4 m |
| Hartstown Community School | 951.9 m |

**43 public-transport stops** serving routes 139, 220, 220A, 236, 236A, 236T, 238, 270, 270T, 37, 39, 39A, 39X, 70n, BI01, L52.

*Sources: [gtfs](https://www.transportforireland.ie/transitData/Data/GTFS_All.zip) (2026-09-11); [schools](https://www.gov.ie/en/department-of-education/collections/primary-schools-enrolment-figures/) (2026-09-11)*

## Deadlines still open

| Closes | Days | Kind | What | Distance |
|---|---|---|---|---|
| 2026-09-17 | 2 | appeal | [FW26A/0260E: GRANT PERMISSION — Amendment to previously permitted development Ref. FW24A/…](https://services.arcgis.com/NzlPQPKn5QF9v2US/ArcGIS/rest/services/IrishPlanningApplications/FeatureServer/0/query?where=PlanningAuthority = 'Fingal County Council') | 266.5 m |
| 2026-09-22 | 7 | observation | [FW26A/0324E: application received — The development consists of the retention of first-fl…](https://services.arcgis.com/NzlPQPKn5QF9v2US/ArcGIS/rest/services/IrishPlanningApplications/FeatureServer/0/query?where=PlanningAuthority = 'Fingal County Council') | 784.2 m |
| 2026-09-23 | 8 | observation | [FW26A/0325E: application received — Retention of the single storey timber structure, in u…](https://services.arcgis.com/NzlPQPKn5QF9v2US/ArcGIS/rest/services/IrishPlanningApplications/FeatureServer/0/query?where=PlanningAuthority = 'Fingal County Council') | 766.8 m |
| 2026-10-14 | 29 | jr | [ACP 501541: Appeal withdrawn S.140(1)(a)](https://www.pleanala.ie/en-ie/case/501541) | 922.4 m |
| 2026-10-16 | 31 | jr | [ACP 500216: Grant permission](https://www.pleanala.ie/en-ie/case/500216) | 36.3 m |

*Sources: [acp](https://services-eu1.arcgis.com/o56BSnENmD5mYs3j/arcgis/rest/services/Cases_2016_Onwards/FeatureServer/3) (2026-09-11); [consult](https://dlrcoco.citizenspace.com | https://consult.fingal.ie | https://engage.dublincity.ie) (2026-09-12); [moderngov](https://meetings.fingal.ie) (2026-09-14); [npad](https://services.arcgis.com/NzlPQPKn5QF9v2US/ArcGIS/rest/services/IrishPlanningApplications/FeatureServer) (2026-09-14); [rzlt](https://services.arcgis.com/NzlPQPKn5QF9v2US/arcgis/rest/services/Residential_Zoned_Land_Tax_Annual_Draft_Map2027_view/FeatureServer/0) (2026-09-11)*

---

## Provenance

Every section above reads the PlanSight store only.

| Section | Source | Licence | Last confirmed | URL |
|---|---|---|---|---|
| location | places | CC-BY-4.0 | 2026-09-11 | [link](https://services-eu1.arcgis.com/FH5XCsx8rYXqnjF5/arcgis/rest/services/Administrative_Areas___OSi_National_Statutory_Boundaries/FeatureServer/0) |
| parcel | parcels | CC-BY-4.0 | 2026-09-11 | [link](https://services-eu1.arcgis.com/FH5XCsx8rYXqnjF5/arcgis/rest/services/Cadastral_Parcels_Freehold/FeatureServer/12) |
| zoning | zoning | CC-BY-4.0 | 2026-09-12 | [link](https://services.arcgis.com/NzlPQPKn5QF9v2US/arcgis/rest/services/GZT_Current_Plan/FeatureServer/0) |
| constraints | constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 2026-09-11 | [link](https://data.gov.ie/ (see the per-sub-source rows in `source`)) |
| constraints | constraints.radon | CC-BY-4.0 | 2026-09-11 | [link](https://gis.epa.ie/geoserver/ows?typeNames=EPA:RadonRiskMapofIreland) |
| constraints | constraints.rps | CC-BY-4.0 (Fingal); public/attribution, unconfirmed (DLR) | 2026-09-11 | [link](https://services.arcgis.com/41mg5wcsG0sphp5W/arcgis/rest/services/ProtectedStructures_CDP2228_dlrcoco/FeatureServer/16) |
| constraints | constraints.smr | CC-BY-4.0 | 2026-09-11 | [link](https://services-eu1.arcgis.com/HyjXgkV6KGMSF3jt/arcgis/rest/services/SMROpenData/FeatureServer/0) |
| rzlt | rzlt | CC-BY-4.0 | 2026-09-11 | [link](https://services.arcgis.com/NzlPQPKn5QF9v2US/arcgis/rest/services/Residential_Zoned_Land_Tax_Annual_Draft_Map2027_view/FeatureServer/0) |
| planning | npad | CC-BY-4.0 | 2026-09-14 | [link](https://services.arcgis.com/NzlPQPKn5QF9v2US/ArcGIS/rest/services/IrishPlanningApplications/FeatureServer) |
| appeals | acp | CC-BY-4.0 | 2026-09-11 | [link](https://services-eu1.arcgis.com/o56BSnENmD5mYs3j/arcgis/rest/services/Cases_2016_Onwards/FeatureServer/3) |
| commencements | bcms | CC-BY-4.0 | 2026-09-14 | [link](https://data.nbco.gov.ie/dataset/2704a333-874d-46f5-b3bc-3673766bf816/resource/0774e781-7af8-46da-b623-872e74cf541e/download/buildingscnscccs.csv) |
| sales | cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 2026-09-11 | [link](https://www.daft.ie/ (via Cara `daft_listing`)) |
| sales | daft_gateway | Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data. | 2026-09-14 | [link](https://gateway.daft.ie/old/v1/listings) |
| sales | ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 2026-09-14 | [link](https://www.propertypriceregister.ie/website/npsra/pprweb.nsf/PPRDownloads?OpenForm) |
| consultations | consult | public | 2026-09-12 | [link](https://dlrcoco.citizenspace.com \| https://consult.fingal.ie \| https://engage.dublincity.ie) |
| council_items | moderngov | public | 2026-09-14 | [link](https://meetings.fingal.ie) |
| capacity | esbn | all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought | 2026-09-11 | [link](https://www.esbnetworks.ie/services/get-connected/renewable-connection/network-capacity-heatmap) |
| public_land | lda_lands | CC-BY-4.0 | 2026-09-11 | [link](https://lda.ie/public-lands/register-of-relevant-lands) |
| projects | social_housing | CC-BY-SA-4.0 | 2026-09-11 | [link](https://www.gov.ie/en/department-of-housing-local-government-and-heritage/collections/social-housing-construction-projects-status-reports/) |
| amenities | gtfs | CC-BY-4.0 | 2026-09-11 | [link](https://www.transportforireland.ie/transitData/Data/GTFS_All.zip) |
| amenities | schools | CC-BY-4.0 | 2026-09-11 | [link](https://www.gov.ie/en/department-of-education/collections/primary-schools-enrolment-figures/) |
| deadlines | acp | CC-BY-4.0 | 2026-09-11 | [link](https://services-eu1.arcgis.com/o56BSnENmD5mYs3j/arcgis/rest/services/Cases_2016_Onwards/FeatureServer/3) |
| deadlines | consult | public | 2026-09-12 | [link](https://dlrcoco.citizenspace.com \| https://consult.fingal.ie \| https://engage.dublincity.ie) |
| deadlines | moderngov | public | 2026-09-14 | [link](https://meetings.fingal.ie) |
| deadlines | npad | CC-BY-4.0 | 2026-09-14 | [link](https://services.arcgis.com/NzlPQPKn5QF9v2US/ArcGIS/rest/services/IrishPlanningApplications/FeatureServer) |
| deadlines | rzlt | CC-BY-4.0 | 2026-09-11 | [link](https://services.arcgis.com/NzlPQPKn5QF9v2US/arcgis/rest/services/Residential_Zoned_Land_Tax_Annual_Draft_Map2027_view/FeatureServer/0) |
