Clay Farm, Ballyogan Road, Dublin 18.
Case facts
927 no. residential units (355 no. houses and 572 no. apartments), a neighbourhood centre containing a childcare facility and 2 no. retail units, the associated section of the Clay Farm Loop Road from the bridge road link with Phase 1 to the south western site boundary, associated internal roads, pedestrian and cycle paths, open space, and all associated site and infrastructural works. The application site includes the possible linear earthworks (DU026-087), a Recorded Monument, located along the northern site boundary.
- Planning authority
- Dún Laoghaire-Rathdown County Council
- Council reference
- —
- Council decision
- —
- Commission decision
- Granted with conditions 2 Aug 2018
- Inspector's recommendation
- See the inspector's report (not yet indexed).
Timeline
- 1 May 2018Appeal received by ACP
- 2 Aug 2018Appeal decidedJr window closed 27 Sept 2018
Documents
Links go to pleanala.ie. We keep working copies for indexing only and do not serve them.
Provenance
Case row from the Commission's open-data feed (Cases 2016 onwards), fetched 11 Sept 2026, 15:23. Appeal counts on this site use the Commission's own case register, not NOAC or OPR totals.
Source: acp · fetched 11 Sept 2026, 15:23
| Source | Licence | Fetched | Link |
|---|---|---|---|
| acp | CC-BY-4.0 | 11 Sept 2026, 15:23 | open |