PlanningRegister.ie
An Coimisiún Pleanála · PL29S.301602 · Planning Appeal

Site of c. 0.62 ha located at Harold's Cross Greyhound Stadium, Harold's Cross, Dublin 6

Temp: granted on appeal 9 Nov 2018.

Received by the Commission 14 May 2018We first saw it 11 Sept 2026, 23:29
Judicial review window closes 14 Jan 2019 closed 2833 days ago
8 weeks from the Commission's decision (9 Nov 2018) · s.50 Planning and Development Act 2000

Case facts

Provision of temp. 2-storey primary school comprising 12 no. classrooms with internal vehicular turning circle, 2 car parking spaces, bicycle/scooter parking, play areas, 1 no. pedestrian entrance gate, revised boundary treatment, piped infrastructure, landscaping, signage and associated site development works. Temporary permission for 5 years.

Planning authority
Dublin City Council
Council reference
4412/17
Council decision
—
Commission decision
Granted with conditions 9 Nov 2018
Inspector's recommendation
Responses...................................................................................... 16 7.0 Assessment ....................................................................................................... 20 8.0 Recommendation............................................................................................... 27 9.0 Reasons and Considerations ............................................................................. 27 10.0 Conditions. .................................................................................................. 27 ABP 301602-18 Inspector’s Report Page

Timeline

  • 14 May 2018
    Appeal received by ACP
  • 9 Nov 2018
    Appeal decided
    Jr window closed 14 Jan 2019

Documents

Links go to pleanala.ie. We keep working copies for indexing only and do not serve them.

Matched passages full-text search

  • Responses...................................................................................... 16 7.0 Assessment ....................................................................................................... 20 8.0 Recommendation............................................................................................... 27 9.0 Reasons and Considerations ............................................................................. 27 10.0 Conditions. .................................................................................................. 27 ABP 301602-18 Inspector’s Report Page
    inspector_report 301602 (p. 2/30) — https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/301/r301602.pdf
  • indicates recommendations that additional information be requested from the applicant, details of which are outlined in para. 2.3 above. ABP 301602-18 Inspector
    inspector_report 301602 (p. 5/30) — https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/301/r301602.pdf
  • proposed Grosvenor Lane access arrangements are not in accordance with recommended guidance and standards and as to suitability and safety of Grosvenor Lane, reference…authority decision and a mobility manager will manage access along ABP 301602-18 Inspector’s Report Page
    inspector_report 301602 (p. 14/30) — https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/301/r301602.pdf
  • report of the Drainage Division dated 8th January 2018 indicates a recommendation for a request for additional information to be issue d to include…addressed in a Demolition and Construction Management Plan. ABP 301602-18 Inspector’s Report Page
    inspector_report 301602 (p. 6/30) — https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/301/r301602.pdf

Provenance

Case row from the Commission's open-data feed (Cases 2016 onwards), fetched 11 Sept 2026, 23:29. Appeal counts on this site use the Commission's own case register, not NOAC or OPR totals.

Source: An Coimisiún Pleanála cases (ArcGIS feed) · fetched 11 Sept 2026, 23:29
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.011 Sept 2026, 23:29open