An Coimisiún Pleanála · PL29S.311251 · Planning Appeal
Murray's Public House, 1, Bow Bridge, Kilmainham Lane, Dublin 8, D08 H1W6
Outdoor seating area: refused on appeal 3 Feb 2022.
Received by the Commission 30 Aug 2021We first saw it 11 Sept 2026, 23:29
Judicial review window closes 31 Mar 2022 closed 1680 days ago
8 weeks from the Commission's decision (3 Feb 2022) · s.50 Planning and Development Act 2000
Case facts
Construction of outdoor seating area with timber, steel and glass dividing panels over sailing the Camac river to the east elevation.
- Planning authority
- Dublin City Council
- Council reference
- 2937/21
- Council decision
- Refuse permission 4 Aug 2021
- Commission decision
- Refused 3 Feb 2022
- Inspector's recommendation
- Authority Response ........................................................................ 7 7.0 Assessment ......................................................................................................... 7 8.0 Recommendation................................................................................................. 9 9.0 Reasons and Considerations ............................................................................... 9 ABP 311251-21 Inspector’s Report Page
Timeline
- 10 Jun 2021Application received by the council
- 4 Aug 2021Council decision — Refuse permission
- 30 Aug 2021Appeal received by ACP
- 3 Feb 2022Appeal decidedJr window closed 31 Mar 2022
Documents
Links go to pleanala.ie. We keep working copies for indexing only and do not serve them.
Matched passages full-text search
- Authority Response ........................................................................ 7 7.0 Assessment ......................................................................................................... 7 8.0 Recommendation................................................................................................. 9 9.0 Reasons and Considerations ............................................................................... 9 ABP 311251-21 Inspector’s Report Page
- buffer zones to ensure protection of water quality. It is therefore recommended in the report that an appropriate flood risk assessment report be prepared…flooding at the site location and in the vicinity. ABP 311251-21 Inspector’s Report Page
Provenance
Case row from the Commission's open-data feed (Cases 2016 onwards), fetched 11 Sept 2026, 23:29. Appeal counts on this site use the Commission's own case register, not NOAC or OPR totals.
Source: An Coimisiún Pleanála cases (ArcGIS feed) · fetched 11 Sept 2026, 23:29
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 11 Sept 2026, 23:29 | open |