Carlow County Council · 18323
Rathoe Wastewater Treatment Plant, Rathoe, Co. Carlow
Approved in Nov 2018. The approval ran out in 2023.
- 10 Aug 2018Received
- 4 Oct 2018Conditional
- 6 Nov 2018Final approval
- 5 Nov 2023Approval ran out
- Status
- Approved
- Decision
- Conditional · 4 Oct 2018
- Council
- Carlow County Council
- Type
- PERMISSION
- Site
- 206 m²
Live near Rathoe Wastewater Treatment Plant?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
to construct 2 No. 9.17m long x 6m wide sludge drying reed beds and associated site works within the boundary of the existing Rathoe Wastewater Treatment Plant
Planning details
- Reference
- 18323
- Local authority
- Carlow County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 10 Aug 2018
- Observations close
- 14 Sept 2018 (closed 2959 days ago)
- Decision due
- 4 Oct 2018 · decided 4 Oct 2018
- Decision
- Conditional on 4 Oct 2018
- Site area
- 206 m² from the mapped boundary, not the council's figure
Nearby 5 · 500 m · 5 years
Protections nearby 250 m
- NIAH-recorded building · 2
- Recorded monument · 9
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
18323 is a planning application to Carlow County Council for to construct 2 No. 9.17m long x 6m wide sludge drying reed beds and associated site, received on 10 Aug 2018; permission was granted with conditions on 4 Oct 2018.