Coppengh , Tullow , County Carlow
- 2 Aug 2023Received
- 6 Sept 2023Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Carlow County Council
- Type
- PERMISSION
- Site
- 22.55 ha
What’s proposed
a five year planning permission for the development of the following elements: The erection and operation of a photovoltaic energy development which includes the erection of c. 20.9 ha fixed panels on ground mounted frames with an export capacity of c. twenty five mega-watt, 1no. energy storage compound with an export capacity of twenty five mega-watts, customer switchgear container, 1no. DSO substation which will be connected to the national grid, electrical transformer and inverter units on an overall site area of c. 22.45 ha, underground cabling and ducting, spare equipment container, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary activities. The proposed development will have a projected life span of 35 years
2360157 is a planning application to Carlow County Council for a five year planning permission for the development of the following elements: The, received on 2 Aug 2023; the file is recorded as incompleted application.
Planning details
- Reference
- 2360157
- Local authority
- Carlow County Council
- Status
- Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
- Received
- 2 Aug 2023
- Observations close
- 6 Sept 2023 (closed 1108 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- a five year planning permission for the development of the following elements: The erection and operation of a photovoltaic energy development which includes the erection of c. 20.9 ha fixed panels on ground mounted frames with an export capacity of c. twenty five mega-watt, 1no. energy storage compound with an export capacity of twenty five mega-watts, customer switchgear container, 1no. DSO substation which will be connected to the national grid, electrical transformer and inverter units on an overall site area of c. 22.45 ha, underground cabling and ducting, spare equipment container, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary activities. The proposed development will have a projected life span of 35 yearsAs published by the register.
- Site area
- 22.55 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 52.82039, -6.73683
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 171428). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/CarlowCC/AppFileRefDetails/2360157/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |