Newstown Ardattin , Tullow , Co. Carlow
- 27 Nov 2024Received
- 17 Oct 2025Conditional
- 19 Nov 2025Final grant
- 18 Nov 2030Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 17 Oct 2025
- Council
- Carlow County Council
- Type
- PERMISSION
- Site
- 2.13 ha
What’s proposed
(i) the construction of a new building of 881m2 to house 16 no. 3.8m diameter and 13.5m height malted grain silos and associated gantries, 2 no. grain cleaners and associated plant along with bulk out loading facility, (ii) construction of a new boiler house of 95m2 and a new ESB substation and customer switch room of 25m2, (iii) construction of 6 no. 22m diameter and 21.5m height grain storage silos with associated underground conveyor system along with gantries and ancillary equipment to a max height of 25.2m to replace the previously approved 2 no. grain storage buildings as part of planning ref no. 23/2 (iv) relocation of existing weighbridge and construction of a new weighbridge (v) relocation of previously approved Modular Malting Units, Storage Shed and 4 No. Stainless Steel Cylindrical Water Storage Tanks (planning ref no. 23/2) (vi) all on a new concrete apron along with all associated site development works
2460379 is a planning application to Carlow County Council for (i) the construction of a new building of 881m2 to house 16 no. 3.8m diameter and 13.5m, received on 27 Nov 2024; permission was granted with conditions on 17 Oct 2025.
Planning details
- Reference
- 2460379
- Local authority
- Carlow County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 27 Nov 2024
- Observations close
- 10 Jan 2025 (closed 626 days ago)
- Decision due
- 21 Oct 2025 · decided 17 Oct 2025
- Decision
- Conditional on 17 Oct 2025
- Proposed development
- (i) the construction of a new building of 881m2 to house 16 no. 3.8m diameter and 13.5m height malted grain silos and associated gantries, 2 no. grain cleaners and associated plant along with bulk out loading facility, (ii) construction of a new boiler house of 95m2 and a new ESB substation and customer switch room of 25m2, (iii) construction of 6 no. 22m diameter and 21.5m height grain storage silos with associated underground conveyor system along with gantries and ancillary equipment to a max height of 25.2m to replace the previously approved 2 no. grain storage buildings as part of planning ref no. 23/2 (iv) relocation of existing weighbridge and construction of a new weighbridge (v) relocation of previously approved Modular Malting Units, Storage Shed and 4 No. Stainless Steel Cylindrical Water Storage Tanks (planning ref no. 23/2) (vi) all on a new concrete apron along with all associated site development worksAs published by the register.
- Site area
- 2.13 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 4 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 22 Sept 2026, 16:10 (store id 172744). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/CarlowCC/AppFileRefDetails/2460379/0.
Source: npad · fetched 22 Sept 2026, 16:10
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 22 Sept 2026, 16:10 | open |