Straboe, Ballyhacket Lower and Ballycook, Co. Carlow
Declared invalid.
- 31 Mar 2026Received
- 5 May 2026Observations closed
Planning details
- Status
- Withdrawn or invalid
- Reference
- 2660091
- Received
- 31 Mar 2026
- Site
- 126.33 ha
What’s proposed
A proposed Solar Farm and Battery Energy Storage System. The development that will consist of: (i) Construction and operation solar PV panels on ground mounted steel supported structures with associated string inverters;
Show all
(ii) Construction of a 50 MW Battery Energy Storage System (BESS) compound consisting of BESS units, integrated cabinets, spare parts containers, independent power producer (IPP) building (c. 64sqm) and security fencing (c. 2.6m in height); (iii) Installation of 13 no. transformer stations at various points across the site; (iv) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical inverters/transformers; (v) Provision of 1 no. new site entrance from the L6003 and provision of 2 no. passing bays along the L6003; (vi) Provision of internal access tracks and watercourse/drain crossings, perimeter fencing, pole mounted CCTV cameras; (vii) 1 no. temporary construction compound; (viii) All associated site development, landscaping, drainage arrangements and ancillary works. The proposed solar farm development spans a total site area measuring c. 126.4ha, of which c. 61.3ha, the subject of this application, is located in Co. Carlow and c. 65.1ha is located in Co. Kildare. A separate planning application is being lodged with Kildare County Council. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar PV panels on the entire development, including Carlow and Kildare, is estimated to be c. 120MW. A Natura Impact Statement (NIS) has been prepared and was submitted as part of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall…
Cut short by the council feed. Full text ↗
1 other application within 500 m in the last year
Open the reportNearby 1 · 500 m · 12 months
Protections nearby 250 m
- Recorded monument · 17
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
2660091 is a planning application to Carlow County Council for a proposed Solar Farm and Battery Energy Storage System. The development that will, received on 31 Mar 2026; the file is recorded as incompleted application.