Tinarana, Rahena Beg, Ogonnelloe Tuamgraney
Approved in Jan 2018. The approval ran out in 2023.
- 7 Sept 2017Received
- 20 Dec 2017Conditional
- 28 Jan 2018Final approval
- 27 Jan 2023Approval ran out
- Status
- Approved
- Decision
- Conditional · 20 Dec 2017
- Council
- Clare County Council
- Type
- PERMISSION
- Units
- 1
- Site
- 3.42 ha
What’s proposed
for part demolition, modification and renovation of an existing dwelling house, conversion of existing stable buildings to residential use including two extensions. Replace the existing metal roof on the coach house with a traditional slate roof. Upgrading of existing entrance road and main entrance on the R463 public road. Upgrading of the existing wastewater treatment system with installation of a new P6 Advanced Aeration waste water treatment unit and pumped drip feed infiltration system, to cater for 4-bedroom accommodation capacity. The buildings are within the curtilage of a protected structure. Repairs and maintenance works to existing stone bridge and open drains and culverts within the curtilage of the dwelling and all associated site works
Planning details
- Reference
- 17685
- Local authority
- Clare County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 7 Sept 2017
- Observations close
- 12 Oct 2017 (closed 3291 days ago)
- Decision due
- 9 Jan 2018 · decided 20 Dec 2017
- Decision
- Conditional on 20 Dec 2017
- Site area
- 3.42 ha from the mapped boundary, not the council's figure
Nearby 2 · 500 m · 5 years
Homes nearby
Protections nearby 250 m
- NIAH-recorded building · 1
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
17685 is a planning application to Clare County Council for for part demolition, modification and renovation of an existing dwelling house, received on 7 Sept 2017; permission was granted with conditions on 20 Dec 2017.