PlanningRegister.ie
Clare County Council · 208000

Boheraroan, Newmarket on Fergus, Co Clare

Approved in Mar 2020. The approval ran out in 2025.

  1. 2 Jan 2020Received
  2. 9 Mar 2020Conditional
  3. 9 Mar 2025Approval ran out
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Approved
Decision
Conditional · 9 Mar 2020
Council
Clare County Council
Type
PERMISSION
Units
18
Site
3,643 m²

Live near Boheraroan?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

proposes to carry out the following development. The construction of a new housing estate development consisting of: a. 18 no. residential units comprising of: (1) 4 no. 1-bedroom apartments, i.e. Type A (2) 12 no. 2-bedroom apartments, i.e. Type B (3) 2 no. 3-bedroom apartments, i.e. Type C b. 27 ancillary car parking spaces within the development. c. The construction of pedestrian access point to the site. d. New Vehicular access point to the site. e. Connection to main sewer and watermain. f. Alterations to ground levels to accommodate the development. g. Surface water management will include attenuation and discharge to surface water network. h. All ancillary site works to include boundary and landscaping works. In accordance with the Habits Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development

Planning details

Reference
208000
Local authority
Clare County Council
Status
Granted with conditions · register status “DECISION MADE”
Received
2 Jan 2020
Observations close
6 Feb 2020 (closed 2438 days ago)
Decision due
9 Apr 2020 · decided 9 Mar 2020
Decision
Conditional on 9 Mar 2020
Proposed development
proposes to carry out the following development. The construction of a new housing estate development consisting of: a. 18 no. residential units comprising of: (1) 4 no. 1-bedroom apartments, i.e. Type A (2) 12 no. 2-bedroom apartments, i.e. Type B (3) 2 no. 3-bedroom apartments, i.e. Type C b. 27 ancillary car parking spaces within the development. c. The construction of pedestrian access point to the site. d. New Vehicular access point to the site. e. Connection to main sewer and watermain. f. Alterations to ground levels to accommodate the development. g. Surface water management will include attenuation and discharge to surface water network. h. All ancillary site works to include boundary and landscaping works. In accordance with the Habits Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
As published by the register.
Site area
3,643 m² from the mapped boundary, not the council's figure
Applicant
Clare County Council council register

Nearby 22 · 500 m · 5 years

Show all 22

Explore this area on the map →

Homes nearby

Zoning

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

No mapped flood area nearby.

  • Recorded monument · 2
    Fulacht fia; R123787

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open
Summary

208000 is a planning application to Clare County Council for proposes to carry out the following development. The construction of a new housing, received on 2 Jan 2020; permission was granted with conditions on 9 Mar 2020.