PlanningRegister.ie
Clare County Council · 211232

Ardnacrusha Generating Station, Castlebank, Ardnacrusha Co Clare

Approved in Feb 2022. No sign of building yet.

  1. 19 Nov 2021Received
  2. 12 Jan 2022Conditional
  3. 15 Feb 2022Final approval
  4. 14 Feb 2027Approval runs out
Status
Approved
Decision
Conditional · 12 Jan 2022
Council
Clare County Council
Type
PERMISSION
Units
1
Site
397 m²

What’s proposed

for development on lands located within the site of the Ardnacrusha Generating Station, Castlebank, Ardnacrusha, Co. Clare, Eircode V94 VR0K, in the townland of Ballykeelaun. The development consists of upgrading works to the electricity network within the site comprising: (a) 1 No. new 38kV line/cable interface mast (with a maximum height of c.16m above ground) on the existing Ardnacrusha Nenagh-Birdhill 38kV line; (b) 1 No. new 38kV line/cable interface mast (with a maximum height of c.16m above ground) on the existing Ardnacrusha - Moylish line and an additional c. 30m of overhead line connecting to an existing overhead line; (c) 1 No. temporary 38kV structure (with a maximum height of c.16.55 m above ground) on the existing Ardnacrusha - Tulla / Ardnacrusha - Birdhill 38kV line to remain in place for up to 5 years while works area ongoing (d) all ancillary development. For information purposes only: associated development works include the removal of existing overhead line structures and the undergrounding and/or relocation of existing overhead lines on the site. Such works comprise exempted development, having regard to the provisions of Section 4(1)(g) of the Planning Act (as amended) and Class 28 of the Planning and Development Regulations 2001 (as amended) respectively, and as such are not subject to this application. The proposed works are to existing networks assets located within the site at Ardnacrusha Generating Station - a Protected Structure (Reference No 311) under the Clare County Development Plan, 2017-2023. No works are proposed to the Protected Structure

Planning details

Reference
211232
Local authority
Clare County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
19 Nov 2021
Decision due
22 Jan 2022 · decided 12 Jan 2022
Decision
Conditional on 12 Jan 2022
Site area
397 m² from the mapped boundary, not the council's figure

Live near Ardnacrusha Generating Station?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

Nearby 2 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

G1 — Open space with recreation

Open space with active recreational amenities — pitches, courts, play areas.

N3.2 — Strategic infrastructure

Land tied to a national or strategic asset (airport, port, rail corridor). Uses are controlled by that asset's own plan.

Protections nearby 250 m

  • NIAH-recorded building · 1
    Ardnacrusha Power Station

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

211232 is a planning application to Clare County Council for for development on lands located within the site of the Ardnacrusha Generating Station, received on 19 Nov 2021; permission was granted with conditions on 12 Jan 2022.