PlanningRegister.ie
Clare County Council · 21695

Drumquin, Barefield, Ennis Co Clare

Approved in Jan 2022. No sign of building yet.

  1. 1 Jul 2021Received
  2. 15 Dec 2021Conditional
  3. 26 Jan 2022Final approval
  4. 25 Jan 2027Approval runs out
Status
Approved
Decision
Conditional · 15 Dec 2021
Council
Clare County Council
Type
PERMISSION
Units
22
Site
1.36 ha

What’s proposed

for the construction of 22 Residential Dwelling houses at Drumquin, Barefield, Ennis, Co. Clare. This application seeks planning PERMISSION for the following: 1. The construction of 2 no. detached Dormer Bungalows (4 Bedroom) House Type A, 2. The construction of 6 no. semidetached Dormer bungalows (4 Bedroom) House Type A1, 3. The construction of 4 no. Detached 2 storey dwellings with Attic accommodation (5 bedroom) House Type B, 4. The construction of 8 no. Detached 2 storey dwellings (4 bedroom) House Type C, 5. The construction of 2no. semidetached two storey dwellings (3 bedroom) House Type D, 6 The construction of on street public parking, footpaths and Street lighting, 7. The connection to the Existing public mains Sewerage and water network facilities at this location and the extension and amendment of same. 8. All associated site boundary walls, gates and fences, 9. All associated and ancillary site works and services

Planning details

Reference
21695
Local authority
Clare County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
1 Jul 2021
Decision due
15 Dec 2021 · decided 15 Dec 2021
Decision
Conditional on 15 Dec 2021
Site area
1.36 ha from the mapped boundary, not the council's figure

Live near Drumquin?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

Nearby 2 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

G3 — High amenity

Protected high-amenity landscape. Development is resisted to preserve the character of the area.

G5 — Open space and amenity

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

O2 — Green belt

Zoned to protect the open land between urban areas. Development is strongly resisted.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

S3 — Community infrastructure

Reserved for civic, religious, community, education, health-care and social infrastructure.

S6 — Sustainable neighbourhood infrastructure

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

Protections nearby 250 m

  • Recorded monument · 5
    Ringfort - cashel; Burnt mound

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

21695 is a planning application to Clare County Council for for the construction of 22 Residential Dwelling houses at Drumquin, Barefield, Ennis, received on 1 Jul 2021; permission was granted with conditions on 15 Dec 2021.