PlanningRegister.ie
Clare County Council · 23290

Crossmore , Co Clare

  1. 17 May 2023Received
  2. 11 Jul 2023Conditional
  3. 16 Aug 2023Final grant
  4. 21 Nov 2024Permission expires
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Granted with conditions
Decision
Conditional · 11 Jul 2023
Council
Clare County Council
Type
PERMISSION
Site
90.25 ha

What’s proposed

for development at lands at Crossmore County Clare in the townlands of Furroor, Illaunatoo or Sorrelisand, Boolynakockaun and Booltiagh. The development will consist of: 1. Amendment to item (1) of Permitted Development Pl. Ref: 21/1057 to install a 38kV electrical connection over a total length of approximately 11km, from the permitted Crossmore Wind Farm (Pl. Ref: 09/123, as extended under Pl. Ref: 19/388 and altered by Pl. Ref: 20/284) to the entrance to the existing Booltiagh 110kV electrical substation. This amended connection will consist of: a. Revision to site boundaries as permitted under Pl. Ref: 21/1057; b. Removal of permitted overhead line from permitted polesets north of Local Road L2084 (previously numbered polesets 1-40 consented under Pl. Ref: 21/1057) for a distance of circa 4km and its replacement with c. 6.5km of underground electrical cabling along unnamed Local Roads. c. Relocation of permitted poleset number 40 (consented under Pl. Ref: 21/1057) 7m (meters) south. Redesign of poleset number 40 from double (as permitted under Pl. Ref: 21/1057) to triple (termination) poleset. The entirety of the grid connection from Crossmore Wind Farm to the existing Booltiagh 110kV electrical substation will therefore comprise c. 5.5km of overhead line (poleset numbers 41-93 conscented under Pl. Ref: 21/1057) c. 6.5km of underground cable (proposed under subject application) 2. Site Drainage 3. All associated site development and ancillary works. The application will be accompanied by a Natura Impact Statement (NIS)

23290 is a planning application to Clare County Council for for development at lands at Crossmore County Clare in the townlands of Furroor, received on 17 May 2023; permission was granted with conditions on 11 Jul 2023.

Planning details

Reference
23290
Local authority
Clare County Council
Status
Granted with conditions · register status “APPLICATION FINALISED
Received
17 May 2023
Observations close
21 Jun 2023 (closed 1185 days ago)
Decision due
11 Jul 2023 · decided 11 Jul 2023
Decision
Conditional on 11 Jul 2023
Proposed development
for development at lands at Crossmore County Clare in the townlands of Furroor, Illaunatoo or Sorrelisand, Boolynakockaun and Booltiagh. The development will consist of: 1. Amendment to item (1) of Permitted Development Pl. Ref: 21/1057 to install a 38kV electrical connection over a total length of approximately 11km, from the permitted Crossmore Wind Farm (Pl. Ref: 09/123, as extended under Pl. Ref: 19/388 and altered by Pl. Ref: 20/284) to the entrance to the existing Booltiagh 110kV electrical substation. This amended connection will consist of: a. Revision to site boundaries as permitted under Pl. Ref: 21/1057; b. Removal of permitted overhead line from permitted polesets north of Local Road L2084 (previously numbered polesets 1-40 consented under Pl. Ref: 21/1057) for a distance of circa 4km and its replacement with c. 6.5km of underground electrical cabling along unnamed Local Roads. c. Relocation of permitted poleset number 40 (consented under Pl. Ref: 21/1057) 7m (meters) south. Redesign of poleset number 40 from double (as permitted under Pl. Ref: 21/1057) to triple (termination) poleset. The entirety of the grid connection from Crossmore Wind Farm to the existing Booltiagh 110kV electrical substation will therefore comprise c. 5.5km of overhead line (poleset numbers 41-93 conscented under Pl. Ref: 21/1057) c. 6.5km of underground cable (proposed under subject application) 2. Site Drainage 3. All associated site development and ancillary works. The application will be accompanied by a Natura Impact Statement (NIS)
As published by the register.
Site area
90.25 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Around this site this application first, then everything within 500 m

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 52.75325, -9.23353

Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 185817). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/ClareCC/AppFileRefDetails/23290/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open