Ballygeery West , Co. Clare
- 22 Sept 2023Received
- 22 Oct 2024Conditional
- 26 Nov 2024Final grant
- 25 Nov 2034Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 22 Oct 2024
- Council
- Clare County Council
- Type
- PERMISSION
- Site
- 6.02 ha
What’s proposed
for development which will consist of: 1 No. enclosed battery energy storage system compound on a total of c. 6.2 hectare site, to include: 1 no. 220kv GIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 220kv transformer and four no. auxiliary transformers, up to 192 battery storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), 16 transformer and 32 inverter units. Including access tracks and site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV system, landscaping works and all associated ancillary infrastructure. The proposed development will have a projected life span of 35 years. A Natura Impact Statement has been prepared to accompany this application
2360393 is a planning application to Clare County Council for for development which will consist of: 1 No. enclosed battery energy storage system, received on 22 Sept 2023; permission was granted with conditions on 22 Oct 2024.
Planning details
- Reference
- 2360393
- Local authority
- Clare County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 22 Sept 2023
- Observations close
- 27 Oct 2023 (closed 1057 days ago)
- Decision due
- 23 Oct 2024 · decided 22 Oct 2024
- Decision
- Conditional on 22 Oct 2024
- Proposed development
- for development which will consist of: 1 No. enclosed battery energy storage system compound on a total of c. 6.2 hectare site, to include: 1 no. 220kv GIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 220kv transformer and four no. auxiliary transformers, up to 192 battery storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), 16 transformer and 32 inverter units. Including access tracks and site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV system, landscaping works and all associated ancillary infrastructure. The proposed development will have a projected life span of 35 years. A Natura Impact Statement has been prepared to accompany this applicationAs published by the register.
- Site area
- 6.02 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 52.63869, -9.25481
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 187289). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/ClareCC/AppFileRefDetails/2360393/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |