Dromoland Castle, Dromoland, Newmarket on Fergus
Approved in Apr 2025. No sign of building yet.
- 23 Dec 2024Received
- 25 Feb 2025Conditional
- 1 Apr 2025Final approval
- 31 Mar 2030Approval runs out
- Status
- Approved
- Decision
- Conditional · 25 Feb 2025
- Council
- Clare County Council
- Type
- PERMISSION
- Site
- 1,203 m²
What’s proposed
for development which will provide for the upgrade of the Dromoland Castle Wastewater Treatment Plant and will comprise of: (1) the demolition of the existing above ground wastewater treatment plant tanks; (2) construction of a new inlet works on a raised platform; (3) construction of two new SBR streams to provide secondary treatment; (4) construction of new stormwater holding tanks and sludge storage tank; (5) Construction of a supernatant pumping station, (6) Installation of new control panel kiosk enclosure on a raised platform; (7) Installation of a new chemical dosing system; and (8) all ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
Planning details
- Reference
- 2460672
- Local authority
- Clare County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 23 Dec 2024
- Observations close
- 5 Feb 2025 (closed 615 days ago)
- Decision due
- 25 Feb 2025 · decided 25 Feb 2025
- Decision
- Conditional on 25 Feb 2025
- Site area
- 1,203 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 · 500 m · 5 years
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
Nothing else protected nearby.
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
2460672 is a planning application to Clare County Council for for development which will provide for the upgrade of the Dromoland Castle Wastewater, received on 23 Dec 2024; permission was granted with conditions on 25 Feb 2025.