Armada House and Hotel, Spanish Point, Co. Clare
Decision due 2 Jan 2027.
- 10 Mar 2026Received
- 14 Apr 2026Observations closed
- 2 Jan 2027Decision due
Planning details
- Status
- With the council, no decision yet
- Decision
- Due 2 Jan 2027
- Reference
- 2660146
- Received
- 10 Mar 2026
- Further information
- Requested 1 May 2026 · received 29 Jul 2026
- Site
- 2.43 ha
What’s proposed
For development of 1 no. primary wastewater pumping station at the Armada House and 1 no. secondary wastewater pumping station at the Armada Hotel, Spanish Point County Clare and for the development of a rising main wastewater pipe (c. 4.3kms in length) located within the public road carriageway (L6224, R482 and N67) in the townlands of Leagard South, Dough, Annagh, Caherrush, Emlagh and Quilty West, County Clare.
Show all
The proposed development includes works within the curtilage of a protected structure, Armada House, formally Mother McCauley House (RPS No. 025) and works to the Bealaclugga Bridge which is a protected structure (RPS No. 185). The proposed development will consist of the following: 1. Provision of 1 no. primary wastewater pumping station at the Armada House, to service the existing Armada Hotel and the existing Armada House; 2. Provision of 1 no. secondary wastewater pumping station at the Armada Hotel, including 2 no. wastewater holding tanks; 3. Provision of a 110mm rising main pipe from the Armada Hotel to the Armada House (c. 240m in length), within the public road crossing the R482 and L6224; 4. Provision of 1 no. 110mm rising main pipe located within the public road (L6224, R482 and N67) from the proposed primary wastewater pumping station at the Armada House to the existing Irish Water foul sewer network at Quilty, which conveys flows to the existing Irish Water Kilmurry Ibrickane Wastewater Treatment Plant (Asset Number: D0536-02). The proposed rising main is c.4.3km in length and located entirely within the public road corridor; 5. Decommissioning and removal of 1 no. existing wastewater treatment plant, existing polishing filter, and existing percolation area at the Armada Hotel; 6. Decommissioning and removal of 1 no. existing wastewater treatment system and percolation area at the Armada House; 7. Provision of 1 no. temporary construction compound at the Armada House for the duration of the works; 8. All associated development and site enabling works and ancillary infrastructure including screening planting, scour valves, air valves,1 no. vent pipe, and 1 no. discharge manhole. A Natura Impact Statement (NIS) has been prepared in respect of the proposed…
Cut short by the council feed. Full text ↗
1 other application within 500 m in the last year
Open the reportNearby 1 · 500 m · 12 months
Homes nearby
- For saleCaherush, Quilty, Spanish Point, Co. Clare, V95 H6T7
- For saleCurlew Cottage, Leagard South, Miltown Malbay, Spanish Point, Co. Clare, V95 K704
- Withdrawn22 Westpark, Spanish Point, Miltown Malbay, Co. Clare, V95 H7W6
- WithdrawnCrosses Of Annagh, Annagh, Miltown Malbay, Spanish Point, Co. Clare, V95 K223
Zoning
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Zoned for bulky-goods retail warehousing — large sheds, large car parks.
Land zoned for business use. Expect offices, warehousing, industry or retail rather than housing; a residential application here is swimming against the plan.
Open space with active recreational amenities — pitches, courts, play areas.
Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.
The main town centre — retail, offices, civic uses, apartments.
Reserved for civic, religious, community, education, health-care and social infrastructure.
Protections nearby 250 m
- NIAH-recorded building · 5
- Recorded monument · 14
Where this comes from
National planning feed (NPAD), fetched 11 Nov 2026, 23:00.
Source: National Planning Application Database · fetched 11 Nov 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Nov 2026, 23:00 | open |
Summary
2660146 is a planning application to Clare County Council for for development of 1 no. primary wastewater pumping station at the Armada House and 1, received on 10 Mar 2026; a decision is due by 2 Jan 2027.