Ballykilty House, Ballykilty, Quin Co. Clare
With the council, no decision yet.
- 3 Jun 2026Received
- 8 Jul 2026Observations closed
Planning details
- Status
- With the council, no decision yet
- Reference
- 2660361
- Received
- 3 Jun 2026
- Further information
- Requested 27 Jul 2026
- Site
- 18.22 ha
What’s proposed
To refurbish and extend Ballykilty House to provide a hotel facility of 19 No. Bedrooms, 63 Car Park Spaces, together with all ancillary services. This building is a protected structure – Record Protected Structure (RPS) Ref.
Show all
No. 658 The development will consist of: • Internal refurbishment to existing protected structure of main house. • Structural alterations to main house, to stabilize existing structure and exclude rainwater ingress. • Construction of a Part-2 Storey extension to the Eastern Elevation of the original house, of matching proportions to the current western elevation, to balance the overall front elevation of the new premises. • Refurbishing and repurposing the existing out-buildings to incorporate them into the new development - as per drawings. • Construction of new extensions to incorporate New Reception & Hotel Entrance areas, New Bedroom block, New Kitchen & food preparation areas, New Function Room, New Café Building within the Walled Garden • Construction of a New Car Park • Refurbishment of existing Main Entrance Gateway to property from public road • Upgrade of existing Site roadway within property. • New mechanical & electrical systems incorporating sustainable policies. • Landscaping and reinstatement works including to walled garden • New Ancillary Service Areas and Buildings as per Drawings to include: ESB Sub-Station, Plant Room, Electrical Switch Room, Generator Room, Bin Storage Area, Liquified Petroleum Gas storage area, Photo-voltaic Panel array area, Waste water treatment plant, Sundry Service areas. The construction of a new service road running to the rear of the walled garden to provide access to the service areas noted above. The provision of a series of Geo-Cellular Underground Stormwater Attenuation reservoirs and Ponds and all ancillary stormwater sewers. The provision of foul sewer system to serve the premises with a site specific Waste Water Treatment Plant located on site. All ancillary works. A series of landscaped open spaces provided throughout the site with a mix of hard and soft landscaping, pedestrian and cycle access together with planting and green areas as shown on the drawings. All landscaping, including planting to consolidate tree lines and hedgerows forming existing site boundaries with adjoining agricultural lands
3 other applications within 500 m in five years
Open the reportNearby 3 · 500 m · 5 years
Homes nearby
- For saleBallyhannon, Quin, Co. Clare
- For saleRiverwood, Coill na hAbhann, Quin, Ennis, Co. Clare
- For saleNa Banracha, Residential Serviced Sites, Quin, Co. Clare
- For saleCragataska, Quin, Co. Clare
- WithdrawnQuin Gardens, Quin, Ennis, Co. Clare, V95 TX32
- WithdrawnRooska House, Quin, Ennis, Co. Clare, V95 AK79
Protections nearby 250 m
- NIAH-recorded building · 1
- Recorded monument · 15
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
2660361 is a planning application to Clare County Council for to refurbish and extend Ballykilty House to provide a hotel facility of 19 No. Bedrooms, received on 3 Jun 2026; no decision has been recorded yet.