PlanningRegister.ie
Clare County Council · 2660361

Ballykilty House, Ballykilty, Quin Co. Clare

With the council, no decision yet.

  1. 3 Jun 2026Received
  2. 8 Jul 2026Observations closed

An email when it’s decided. After that, only if it’s appealed or building starts.

Planning details

Status
With the council, no decision yet
Reference
2660361
Received
3 Jun 2026
Further information
Requested 27 Jul 2026
Site
18.22 ha

What’s proposed

To refurbish and extend Ballykilty House to provide a hotel facility of 19 No. Bedrooms, 63 Car Park Spaces, together with all ancillary services. This building is a protected structure – Record Protected Structure (RPS) Ref.

Show all

No. 658 The development will consist of: • Internal refurbishment to existing protected structure of main house. • Structural alterations to main house, to stabilize existing structure and exclude rainwater ingress. • Construction of a Part-2 Storey extension to the Eastern Elevation of the original house, of matching proportions to the current western elevation, to balance the overall front elevation of the new premises. • Refurbishing and repurposing the existing out-buildings to incorporate them into the new development - as per drawings. • Construction of new extensions to incorporate New Reception & Hotel Entrance areas, New Bedroom block, New Kitchen & food preparation areas, New Function Room, New Café Building within the Walled Garden • Construction of a New Car Park • Refurbishment of existing Main Entrance Gateway to property from public road • Upgrade of existing Site roadway within property. • New mechanical & electrical systems incorporating sustainable policies. • Landscaping and reinstatement works including to walled garden • New Ancillary Service Areas and Buildings as per Drawings to include: ESB Sub-Station, Plant Room, Electrical Switch Room, Generator Room, Bin Storage Area, Liquified Petroleum Gas storage area, Photo-voltaic Panel array area, Waste water treatment plant, Sundry Service areas. The construction of a new service road running to the rear of the walled garden to provide access to the service areas noted above. The provision of a series of Geo-Cellular Underground Stormwater Attenuation reservoirs and Ponds and all ancillary stormwater sewers. The provision of foul sewer system to serve the premises with a site specific Waste Water Treatment Plant located on site. All ancillary works. A series of landscaped open spaces provided throughout the site with a mix of hard and soft landscaping, pedestrian and cycle access together with planting and green areas as shown on the drawings. All landscaping, including planting to consolidate tree lines and hedgerows forming existing site boundaries with adjoining agricultural lands

3 other applications within 500 m in five years

Open the report

Nearby 3 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • NIAH-recorded building · 1
    Ballyhannan House
  • Recorded monument · 15
    Enclosure; Barrow - unclassified
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2660361 is a planning application to Clare County Council for to refurbish and extend Ballykilty House to provide a hotel facility of 19 No. Bedrooms, received on 3 Jun 2026; no decision has been recorded yet.