Ballinvuskig , Douglas , Co. Cork
- 29 May 2019Received
- 22 Jul 2019Conditional
- Status
- Appeal decided — granted
- Decision
- Conditional · 22 Jul 2019
- Council
- Cork City Council
- Type
- PERMISSION
- Site
- 44.41 ha
What’s proposed
A solar farm consisting of circa 178,600 m2 of solar panels on ground mounted frames, 1 no. single storey 38 kV substation and associated electrical compound with loop in to existing 38kV overhead line on site via 2 no. new timber polesets, 12 no. single storey electrical inverter/transformer stations, battery storage module and associated equipment container, security fencing, satellite pole, CCTV, landscaping and all associated ancillary development works. Construction and operational access will be via an existing entrance from the L-2462. The proposal will be connected to the national grid via the loop-in to existing overhead wires that traverse the site. The operational lifespan of the solar farm will be 35 years
195371 is a planning application to Cork City Council for a solar farm consisting of circa 178,600 m2 of solar panels on ground mounted frames, 1, received on 29 May 2019; permission was granted with conditions on 22 Jul 2019.
Planning details
- Reference
- 195371
- Local authority
- Cork City Council
- Status
- Appeal decided — granted · register status “APPLICATION FINALISED”
- Received
- 29 May 2019
- Observations close
- 3 Jul 2019 (closed 2635 days ago)
- Decision due
- 23 Jul 2019 · decided 22 Jul 2019
- Decision
- Conditional on 22 Jul 2019
- Proposed development
- A solar farm consisting of circa 178,600 m2 of solar panels on ground mounted frames, 1 no. single storey 38 kV substation and associated electrical compound with loop in to existing 38kV overhead line on site via 2 no. new timber polesets, 12 no. single storey electrical inverter/transformer stations, battery storage module and associated equipment container, security fencing, satellite pole, CCTV, landscaping and all associated ancillary development works. Construction and operational access will be via an existing entrance from the L-2462. The proposal will be connected to the national grid via the loop-in to existing overhead wires that traverse the site. The operational lifespan of the solar farm will be 35 yearsAs published by the register.
- Site area
- 44.41 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 193934). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://planning.corkcity.ie/AppFileRefDetails/195371/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |