Garravagh , Inniscarra , Cork
- 18 Jun 2021Received
- 12 Aug 2021Conditional
- 10 Mar 2022Final grant
- Status
- Appeal decided — granted
- Decision
- Conditional · 12 Aug 2021
- Council
- Cork City Council
- Type
- PERMISSION
- Site
- 2.87 ha
What’s proposed
10 year planning permission for a 20kV overground and underground grid connection cable of c.1.26km in length (of which c.0.43 km is located in the administrative area of Cork County and 0.83 km is located in the administrative area of Cork City) to be provided on overhead poles and in excavated trenches and include associated underground ducting, joint bay and all associated site development and reinstatement works. The proposed grid connection cable will connect the solar farm substation permitted under Cork County Council planning reference 18/7410 (An Bord Pleanála reference 304045-19) which is now located within the administrative area of Cork City with the existing 110kV Coolroe substation. The works will be carried out within the solar farm boundary, on private lands and within the public road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. The
2140293 is a planning application to Cork City Council for 10 year planning permission for a 20kV overground and underground grid connection cable, received on 18 Jun 2021; permission was granted with conditions on 12 Aug 2021.
Planning details
- Reference
- 2140293
- Local authority
- Cork City Council
- Status
- Appeal decided — granted · register status “APPLICATION FINALISED”
- Received
- 18 Jun 2021
- Observations close
- 23 Jul 2021 (closed 1883 days ago)
- Decision due
- 12 Aug 2021 · decided 12 Aug 2021
- Decision
- Conditional on 12 Aug 2021
- Proposed development
- 10 year planning permission for a 20kV overground and underground grid connection cable of c.1.26km in length (of which c.0.43 km is located in the administrative area of Cork County and 0.83 km is located in the administrative area of Cork City) to be provided on overhead poles and in excavated trenches and include associated underground ducting, joint bay and all associated site development and reinstatement works. The proposed grid connection cable will connect the solar farm substation permitted under Cork County Council planning reference 18/7410 (An Bord Pleanála reference 304045-19) which is now located within the administrative area of Cork City with the existing 110kV Coolroe substation. The works will be carried out within the solar farm boundary, on private lands and within the public road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. TheAs published by the register.
- Site area
- 2.87 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 51.89146, -8.63117
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
The register records appeal ABP-311292-21 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 193276). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://planning.corkcity.ie/AppFileRefDetails/2140293/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |