PlanningRegister.ie
Cork City Council · 2140758

Carraig Centre, Ballincollig, Old Quarter

Approved in Apr 2022. Built and signed off.

  1. 20 Dec 2021Received
  2. 22 Feb 2022Conditional
  3. 5 Apr 2022Final approval
  4. 31 Mar 2025Building started
  5. 13 Oct 2025Signed off

Planning details

Status
Building started
Decision
Conditional · 22 Feb 2022
Reference
2140758
Received
20 Dec 2021
Site
3,814 m²

What’s proposed

Permission is sought for alterations to existing structure and change of use from previously proposed library to proposed Community Centre use. The subject building is a protected structure. The works include the formation of 02 new internal door opes in the existing structure and the fit out of the existing shell and core space.

Show all

Externally, the northern façade is proposed to be modified to provide a new external door in place of an existing window, a canopy is proposed to the north elevation, a new gazebo type structure on the rear yard area and all associated site works

12 other applications within 500 m in the last year · 2 open for comments

Open the free report

Nearby 12 · 500 m · 12 months

Distance
Time
Show all 12

Explore this area on the map →

Homes nearby

Building started

  • 31 Mar 2025 · Builder told the council work was starting (seven-day notice) SN0012269CY

Zoning

M2 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

Protections nearby 250 m

  • NIAH-recorded building · 11
    barracks; stables
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2140758 is a planning application to Cork City Council for permission is sought for alterations to existing structure and change of use from, received on 20 Dec 2021; permission was granted with conditions on 22 Feb 2022.