Ballycannon , Kerry Pike , Cork
- 10 Mar 2022Received
- 14 Jun 2022Conditional
- 22 Aug 2023Final grant
- 27 Sept 2024Commenced
- Status
- Commenced
- Decision
- Conditional · 14 Jun 2022
- Council
- Cork City Council
- Type
- PERMISSION
- Site
- 1.50 ha
What’s proposed
Permission for development at a site at Ballycannon, Kerrypike, Cork. The proposed development will consist of the demolition of an existing boundary wall and gated access, and 2 no. existing animal shelters; the construction of a 2-storey commercial building including signage, with ground floor pharmacy and 1 no. medical consulting room, and 4 no. medical consulting rooms and ancillary services at first floor; 31 no. residential housing units to include: 3 no., 4 -bed detached dwellings, 8 no. 4-bed semi-detached dwellings, 16 no. 3-bed semi-detached/end of terrace dwellings, 2 no. 3-bed end of terrace dwellings, and 2 no. 2-bed mid-terrace dwellings; car parking; 1 no. new access; new footpath along the public road; public lighting; provision of a new boundary wall with fence, 1 no. new gated access and 1 no. relocated gated access to an existing dwelling; 1 no. new internal access with entrance pillars to an existing dwelling; and all associated site development, drainage and landscaping works
2240915 is a planning application to Cork City Council for permission for development at a site at Ballycannon, Kerrypike, Cork. The proposed, received on 10 Mar 2022; permission was granted with conditions on 14 Jun 2022.
Planning details
- Reference
- 2240915
- Local authority
- Cork City Council
- Status
- Commenced · register status “APPLICATION FINALISED”
- Received
- 10 Mar 2022
- Observations close
- 14 Apr 2022 (closed 1618 days ago)
- Decision due
- 14 Jun 2022 · decided 14 Jun 2022
- Decision
- Conditional on 14 Jun 2022
- Proposed development
- Permission for development at a site at Ballycannon, Kerrypike, Cork. The proposed development will consist of the demolition of an existing boundary wall and gated access, and 2 no. existing animal shelters; the construction of a 2-storey commercial building including signage, with ground floor pharmacy and 1 no. medical consulting room, and 4 no. medical consulting rooms and ancillary services at first floor; 31 no. residential housing units to include: 3 no., 4 -bed detached dwellings, 8 no. 4-bed semi-detached dwellings, 16 no. 3-bed semi-detached/end of terrace dwellings, 2 no. 3-bed end of terrace dwellings, and 2 no. 2-bed mid-terrace dwellings; car parking; 1 no. new access; new footpath along the public road; public lighting; provision of a new boundary wall with fence, 1 no. new gated access and 1 no. relocated gated access to an existing dwelling; 1 no. new internal access with entrance pillars to an existing dwelling; and all associated site development, drainage and landscaping worksAs published by the register.
- Site area
- 1.50 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 51.91201, -8.57114
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
The register records appeal ABP-314061-22 (status unknown) but we have not matched the ACP case yet.
Commencement
- Commencement notice CN0119870CY
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 195911). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://planning.corkcity.ie/AppFileRefDetails/2240915/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |