Copley Street, South Terrace, Union Quay

Approved in May 2023. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

What’s proposed

Permission for development at Copley Street, South Terrace, Union Quay and Stable Lane, Cork City. The redevelopment of the site comprises of demolition, construction and change of land use from builder’s providers/storage to educational use and change of use from residential to café and study space and includes the following: Demolition of the former Brooks Haughton Builder’s NMerchant’s buildings, structures, and…

Show all

boundary walls. Construction of a new Cork University Business School (CUBS) building ranging from 3 storeys to 6 storeys. The building will include foyer with coffee dock, lecture theatres, academic offices, study and teaching areas, restaurant, service rooms, bin storage area, bike storage, roof top plant and associated screening, ESB sub-station, rooftop photovoltaic panels and rooftop water tank. Renovation of 18 and 19 South Terrace to provide for a café and study space, including demolition of the two-storey rear extension and boundary wall at 18 South Terrace. Provision of a new pedestrian laneway from Copley Street to South Terrace, with gated access which will be open to the public during CUBS operational hours. Landscaping, including provision of a courtyard garden accessed via South Terrace, roof top terrace and roof top garden. Temporary landscaping of a future expansion area to the east of the site, to provide a temporary pocket park, with 2.1m-2.6m high fencing to South Terrace, Copley Street and Stable Lane. Works to the public realm, including widening of a footpath on Copley Street, the provision of a pedestrian crossing at the western end of Copley Street, and the realignment of existing car parking spaces on Copley Street to include provision for a mobility access space and loading bay, and footpath restoration at South Terrace. All ancillary site development works, and signage, including the provision of services, access, lighting and basement area to provide for plant. A Natura Impact Statement will be submitted to the Planning Authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the Planning Authority

  1. 7 Dec 2022Received
  2. 18 Apr 2023Conditional
  3. 30 May 2023Final approval
  4. 30 May 2028Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 18 Apr 2023
Reference
2241614
Received
7 Dec 2022
Site
6,652 m²

27 other applications within 500 m in the last year · 1 open for comments

Get the full report

Nearby 27 · 500 m · 12 months

Distance
Time
Show all 27

Explore this area on the map →

Homes nearby

Zoning

M2 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

Protections nearby 250 m

  • NIAH-recorded building · 164
    house
  • Recorded monument · 4
    Religious house - Augustinian friars; Church
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2241614 is a planning application to Cork City Council for permission for development at Copley Street, South Terrace, Union Quay and Stable Lane, received on 7 Dec 2022; permission was granted with conditions on 18 Apr 2023.