PlanningRegister.ie
Cork City Council · 2443154

Ballyneety, Shournagh Road, Boolypatrick

Approved in Jan 2025. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 2 Aug 2024Received
  2. 4 Dec 2024Conditional
  3. 20 Jan 2025Final approval
  4. 20 Jan 2030Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 4 Dec 2024
Reference
2443154
Received
2 Aug 2024
Site
4,195 m²

What’s proposed

Permission for the following works at existing sessional childcare facility at Ballyneety, Shournagh Road, Boolypatrick, Blarney, Cork, T23TY75: (1) Removal of existing utility shed attached to existing store-and-half stand-alone building (used as sessional pre-school service at ground floor level), (2) Construction of new storey-and half extension to same, to comprise new stairwell to access the existing…

Show all

first-floor, currently used as storage space, and to be converted into staff quarters, and construction of new laundry room at ground floor level; (3) Removal of existing container located to the north west of the site; (4) Construction of new ancillary single-storey storage shed; (5) All associated site works

1 other application within 500 m in the last year

Open the report

Nearby 1 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

P5 — Rural and agricultural

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

Protections nearby 250 m

  • Recorded monument · 2
    Fulacht fia; R112654
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2443154 is a planning application to Cork City Council for permission for the following works at existing sessional childcare facility at, received on 2 Aug 2024; permission was granted with conditions on 4 Dec 2024.