Approved in May 2025. Building started in 2026.

  1. 20 Dec 2024Received
  2. 1 Apr 2025Conditional
  3. 12 May 2025Final approval
  4. 1 Sept 2026Building started

Planning details

Status
Building startedi
Decision
Conditional · 1 Apr 2025
Reference
2443528
Received
20 Dec 2024
Site
1,040 m²

What’s proposed

The development will consist of the modification and extension of the existing dwelling, namely; A) removal of all existing single-storey extensions to the front (south) and rear (north) of the existing dwelling (totalling 25.55sq.m./275.02sq.ft. floor space), B) construction of a single storey extension to the rear (north) and side (east) of the existing dwelling (totalling 101.40sq.m./1091.46sq.ft. floor space), C)…

Show all

alterations to the elevations of the existing dwelling, D) removal of the existing septic tank and percolation area, E) installation of a wastewater treatment system & polishing filter, and F) all ancillary works

6 other applications within 500 m in five years

Open the report

Nearby 6 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Building started

  • 1 Sept 2026 · Builder told the council work was starting (opted out of the finish sign-off) CN0146587CY

Zoning

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2443528 is a planning application to Cork City Council for the development will consist of the modification and extension of the existing dwelling, received on 20 Dec 2024; permission was granted with conditions on 1 Apr 2025.