PlanningRegister.ie
Cork City Council · 2544310

The ESB Marina Power, Generating Station, Centre Park Road

Approved in Mar 2026. No sign of building yet.

  1. 17 Nov 2025Received
  2. 20 Jan 2026Conditional
  3. 3 Mar 2026Final approval
  4. 3 Mar 2031Approval runs out
Status
Approved
Decision
Conditional · 20 Jan 2026
Council
Cork City Council
Type
PERMISSION
Units
1
Site
7.88 ha

Live near The ESB Marina Power?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

What’s proposed

Permission for development at this time at the ESB Marina Power Generation Station, Centre Park Road, Cork, T12V0HH. The development will consist of: (1) Demolition of the following buildings/structures to ground level: Open Cycle Gas Turbine (OCGT) (c. 719 sq.m) and associated mechanical and electrical ancillaries incl. exhaust duct ( c. 349 sq.m) and stell stack (c. 60m in height); Store Building (c. 225 sq.m) and water treatment/ neutralization plant (c. 34 sq.m); Town Water Storage Tank (c. 158 sq.m) and Firefighting Pumphouse (c. 24 sq.m); Security Guards House at station entrance (35 sq.m); Redundant transformers (c. 12m x 34m x 5m); B Station Boiler House (attached to the A Station "red brick" power generation building) (c. 723 sq.m) Ancillary structures associated with Oil Tank Farm (i.e. pipe bridge across Centre Park Road) (c. 72m in length and c. 8m at highest point); Cooling water Pumphouse (c. 139 sq.m); (2) Installation of temporary cladding to the station A "redbrick" power generation building following the removal of boiler house 4 to keep the building weatherproof and secure. (3) All ancillary site services and site development works to facilitate the proposed demolition works

Planning details

Reference
2544310
Local authority
Cork City Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
17 Nov 2025
Observations close
22 Dec 2025 (closed 300 days ago)
Decision due
20 Jan 2026 · decided 20 Jan 2026
Decision
Conditional on 20 Jan 2026
Site area
7.88 ha from the mapped boundary, not the council's figure
Applicant
Electricity Supply Board council register

Nearby 22 · 500 m · 5 years

Show all 22

Explore this area on the map →

Homes nearby

Zoning

G1 — Open space with recreation

Open space with active recreational amenities — pitches, courts, play areas.

G3 — High amenity

Protected high-amenity landscape. Development is resisted to preserve the character of the area.

G5 — Open space and amenity

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

M3 — Neighbourhood centre

A local centre: shops, services and apartments over them, serving the surrounding housing.

N6 — Strategic infrastructure

Land tied to a national or strategic asset (airport, port, rail corridor). Uses are controlled by that asset's own plan.

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

S1 — Third-level education

Reserved for third-level education institutions.

Protections nearby 250 m

  • NIAH-recorded building · 10
    steps; Harbour Commissioners

Where this comes from

National planning feed (NPAD), fetched 4 Oct 2026, 23:40.

Source: Council planning registers · fetched 4 Oct 2026, 23:40
SourceLicenceFetchedLink
Council planning registersCC BY 4.04 Oct 2026, 23:40open
Summary

2544310 is a planning application to Cork City Council for permission for development at this time at the ESB Marina Power Generation Station, received on 17 Nov 2025; permission was granted with conditions on 20 Jan 2026.