Barnahely Ballybricken Ringaskiddy
- 15 Apr 2005Received
- 9 Jun 2005Conditional
- 15 Jul 2005Final grant
- Status
- Granted with conditions
- Decision
- Conditional · 9 Jun 2005
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 83.18 ha
What’s proposed
Biopharmaceutical manufacturing facility comprising of 3 storey manufacturing building with plant room, 4 storey laboratory/administrative building with gas bottle storage area, single storey warehouse building with mezzanine including shipping and receiving area, covered waste management centre, offices, quality control area, ethanol solution preparation and plant areas and loading docks, single storey central utilities plant bulding with mezzanine, workshop and offices, heat and power plant with 30 m high stack ,boilers and two transformers, utility yard comprising of cooling towers, generators, diesel, chemical and water tanks, pumps etc, fire fighting water storage tanks with pump house, AGI to regulate natural gas supply, waste water treatment plant with adjoining 2 storey building with office use, laboratory, plant rooms, sludge treatment and collection and associated treatment tanks,pumps and pipe bridge and 10 m high stack, ancillary and associated site works
05/2431 is a planning application to Cork County Council for biopharmaceutical manufacturing facility comprising of 3 storey manufacturing building, received on 15 Apr 2005; permission was granted with conditions on 9 Jun 2005.
Planning details
- Reference
- 05/2431
- Local authority
- Cork County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 15 Apr 2005
- Observations close
- 20 May 2005 (closed 7791 days ago)
- Decision due
- 9 Jun 2005 · decided 9 Jun 2005
- Decision
- Conditional on 9 Jun 2005
- Proposed development
- Biopharmaceutical manufacturing facility comprising of 3 storey manufacturing building with plant room, 4 storey laboratory/administrative building with gas bottle storage area, single storey warehouse building with mezzanine including shipping and receiving area, covered waste management centre, offices, quality control area, ethanol solution preparation and plant areas and loading docks, single storey central utilities plant bulding with mezzanine, workshop and offices, heat and power plant with 30 m high stack ,boilers and two transformers, utility yard comprising of cooling towers, generators, diesel, chemical and water tanks, pumps etc, fire fighting water storage tanks with pump house, AGI to regulate natural gas supply, waste water treatment plant with adjoining 2 storey building with office use, laboratory, plant rooms, sludge treatment and collection and associated treatment tanks,pumps and pipe bridge and 10 m high stack, ancillary and associated site worksAs published by the register.
- Site area
- 83.18 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 51.83057, -8.33966
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 324694). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/corkcoco/application-details/?ref=05/2431.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |