Brinny Innishannon
- 22 Feb 2011Received
- 15 Apr 2011Conditional
- 23 May 2011Final grant
- Status
- Granted with conditions
- Decision
- Conditional · 15 Apr 2011
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 121 m²
What’s proposed
(a) New pedestrian corridor connecting the production areas of Operations Building 1 (OPS 1) to Operations Building 2 (OPS 2) consisting of a single storey corridor to facilitate personnel moving between the Operations Buildings with a local first floor crossover which will include stairs and personnel lifts to provide access for non-production personnel crossing the new corridor. The development will consist of a total area of 142 square metres at ground floor level and 64 square metres for the first floor cross-over and plant room and height of 10.300 metres. Associated site works will consist of paths and landscaping. (b) Change of use of existing switch room building S900 (total area of 53 square metres) to general use by factory personnel for small part stores and changing facilities
11/4339 is a planning application to Cork County Council for (a) New pedestrian corridor connecting the production areas of Operations Building 1, received on 22 Feb 2011; permission was granted with conditions on 15 Apr 2011.
Planning details
- Reference
- 11/4339
- Local authority
- Cork County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 22 Feb 2011
- Observations close
- 29 Mar 2011 (closed 5652 days ago)
- Decision due
- 18 Apr 2011 · decided 15 Apr 2011
- Decision
- Conditional on 15 Apr 2011
- Proposed development
- (a) New pedestrian corridor connecting the production areas of Operations Building 1 (OPS 1) to Operations Building 2 (OPS 2) consisting of a single storey corridor to facilitate personnel moving between the Operations Buildings with a local first floor crossover which will include stairs and personnel lifts to provide access for non-production personnel crossing the new corridor. The development will consist of a total area of 142 square metres at ground floor level and 64 square metres for the first floor cross-over and plant room and height of 10.300 metres. Associated site works will consist of paths and landscaping. (b) Change of use of existing switch room building S900 (total area of 53 square metres) to general use by factory personnel for small part stores and changing facilitiesAs published by the register.
- Site area
- 121 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 51.78652, -8.70391
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 199058). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/corkcoco/application-details/?ref=11/4339.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |