Oakmount Fanahy Castletownbere Co. Cork
Approved. Building started.
- 19 Mar 2013Received
- 13 May 2013Conditional
- 19 Jun 2013Final approval
- 2 Aug 2016Building started
- Status
- Building started
- Decision
- Conditional · 13 May 2013
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 3,753 m²
Live near Oakmount Fanahy Castletownbere Co. Cork?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
Retention of the following: (a) office/WC prefab unit and permission to relocate same within site boundaries, (b) two number storage containers for general storage and permission to relocate same within site boundaries, (c) two number vehicular entrances, (d) a hatchery unit, (e) a drier unit and (f) septic tank system and planning permission for the following: (i) alterations to an existing vehicular entrance, (ii) close up the second vehicular entrance and construct a new vehicular entrance, (iii) removal of three number containers from site, (iv) construct a new agricultural building for seaweed line preparation and seaweed drying (existing hatchery unit and drier unit to be relocated and incorporated in this building) and (v) revise the existing yard layout to include hard surfaced areas and open green areas, and also to include all associated site works
Planning details
- Reference
- 13/162
- Local authority
- Cork County Council
- Status
- Commenced · register status “APPLICATION FINALISED”
- Received
- 19 Mar 2013
- Observations close
- 23 Apr 2013 (closed 4914 days ago)
- Decision due
- 13 May 2013 · decided 13 May 2013
- Decision
- Conditional on 13 May 2013
- Proposed development
- Retention of the following: (a) office/WC prefab unit and permission to relocate same within site boundaries, (b) two number storage containers for general storage and permission to relocate same within site boundaries, (c) two number vehicular entrances, (d) a hatchery unit, (e) a drier unit and (f) septic tank system and planning permission for the following: (i) alterations to an existing vehicular entrance, (ii) close up the second vehicular entrance and construct a new vehicular entrance, (iii) removal of three number containers from site, (iv) construct a new agricultural building for seaweed line preparation and seaweed drying (existing hatchery unit and drier unit to be relocated and incorporated in this building) and (v) revise the existing yard layout to include hard surfaced areas and open green areas, and also to include all associated site worksAs published by the register.
- Site area
- 3,753 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 4 · 500 m · 5 years
Homes nearby
Building started
- 2 Aug 2016 · Builder told the council work was starting (opted out of the finish sign-off) CN0018876WW
Zoning
Protected high-amenity landscape. Development is resisted to preserve the character of the area.
Protections nearby 250 m
No mapped flood area nearby.
- NIAH-recorded building · 1
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
13/162 is a planning application to Cork County Council for retention of the following: (a) office/WC prefab unit and permission to relocate same, received on 19 Mar 2013; permission was granted with conditions on 13 May 2013.