Mogeely and Killamucky Mogeely Co. Cork
Approved, built and signed off.
- 8 Dec 2016Received
- 4 Aug 2017Conditional
- 30 Jan 2019Building started
- 20 Feb 2020Signed off
- Status
- Building started
- Decision
- Conditional · 4 Aug 2017
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 12.03 ha
Live near Mogeely and Killamucky Mogeely Co. Cork?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
To construct new cheese production facility and a significant upgrade of the existing Dairygold Food Ingredients (DFI) facility. The proposed development consists of: 1. Construction of the following Buildings or structures and associated services and site works:- • Cheese Production Building – predominantly single-storey with 3-storey middle section and 2-storey administration block • Single storey part Open sided, roofed, Milk Intake Unit and piperack structure • Single storey Workshop • Single storey Box Store • 2-storey Reception and Staff Facilities Building • Single storey Boiler House • Single storey RO and Pasteurisation Building • Single storey Weighbridge Security Building • Single storey Water Treatment and Fire Pumphouse Building • Electrical Sub-station and Switchroom • 2-bay Loading Bay structure attached to the northern end of the existing cheese factory • 2 No. water storage tanks (12.6m and 9.6m high); 1 No. Salt Saturation Storage Tank (5.1m high) 2. Closure of 3 entrances and the construction of new entrance for HGV traffic off the L3627 on the northern site boundary. Closure of the existing HGV entrance and construction of new entrance for staff and visitor car traffic only off the L3805 Mogeely-Castlemartyr Road on the eastern site boundary 3. Demolition of the following Buildings or Structures and associated services: a) Dairy and Maintenance Workshop Building; b) Packaging Store; c) Boiler House and 3 No. stacks (33.9m high); d) Canteen; e) Reception and Office Building; f) Generator Building and removal of all associated Redundant Tankage. 4. Upgrade of an existing bund and construction of new adjoining bund to accommodate existing tanks and the following new tankage, (height listed in brackets) and all services associated with the tankage: 6 No. Milk Silos(14.0m), 2 No. Milk Silos(18.5m), 3 No. Cream Storage Tanks(5.8m), 5 No. Cleaning Tanks(8.0m),4 No. Cleaning Tanks(5.0m), 2 No. Whey Silos(12.7m), 2 No. Whey Silos(13.2m), 2 No. Bulk Chemical Tanks(5.45m) 5. Construction of a 124 space Car Park, Internal Roads accessing the site from the new Entrances / Exits, Covered Pedestrian Walkway and mounded Berms, Boundary Walls, Fencing and all Associated Landscaping Works. 6. Upgrade and expansion of the existing Wastewater Treatment Plant including new Balance Tank, Anaerobic and Aerobic Tanks, Clarifier, Picket Fence Thickener, Dissolved Air Flotation (DAF) Plant, Pumping Station, Control Room, Filters and Concrete Plinths. The propo
Planning details
- Reference
- 16/7031
- Local authority
- Cork County Council
- Status
- Commenced · register status “APPLICATION FINALISED”
- Received
- 8 Dec 2016
- Observations close
- 23 Jan 2017 (closed 3543 days ago)
- Decision due
- 8 Aug 2017 · decided 4 Aug 2017
- Decision
- Conditional on 4 Aug 2017
- Proposed development
- To construct new cheese production facility and a significant upgrade of the existing Dairygold Food Ingredients (DFI) facility. The proposed development consists of: 1. Construction of the following Buildings or structures and associated services and site works:- • Cheese Production Building – predominantly single-storey with 3-storey middle section and 2-storey administration block • Single storey part Open sided, roofed, Milk Intake Unit and piperack structure • Single storey Workshop • Single storey Box Store • 2-storey Reception and Staff Facilities Building • Single storey Boiler House • Single storey RO and Pasteurisation Building • Single storey Weighbridge Security Building • Single storey Water Treatment and Fire Pumphouse Building • Electrical Sub-station and Switchroom • 2-bay Loading Bay structure attached to the northern end of the existing cheese factory • 2 No. water storage tanks (12.6m and 9.6m high); 1 No. Salt Saturation Storage Tank (5.1m high) 2. Closure of 3 entrances and the construction of new entrance for HGV traffic off the L3627 on the northern site boundary. Closure of the existing HGV entrance and construction of new entrance for staff and visitor car traffic only off the L3805 Mogeely-Castlemartyr Road on the eastern site boundary 3. Demolition of the following Buildings or Structures and associated services: a) Dairy and Maintenance Workshop Building; b) Packaging Store; c) Boiler House and 3 No. stacks (33.9m high); d) Canteen; e) Reception and Office Building; f) Generator Building and removal of all associated Redundant Tankage. 4. Upgrade of an existing bund and construction of new adjoining bund to accommodate existing tanks and the following new tankage, (height listed in brackets) and all services associated with the tankage: 6 No. Milk Silos(14.0m), 2 No. Milk Silos(18.5m), 3 No. Cream Storage Tanks(5.8m), 5 No. Cleaning Tanks(8.0m),4 No. Cleaning Tanks(5.0m), 2 No. Whey Silos(12.7m), 2 No. Whey Silos(13.2m), 2 No. Bulk Chemical Tanks(5.45m) 5. Construction of a 124 space Car Park, Internal Roads accessing the site from the new Entrances / Exits, Covered Pedestrian Walkway and mounded Berms, Boundary Walls, Fencing and all Associated Landscaping Works. 6. Upgrade and expansion of the existing Wastewater Treatment Plant including new Balance Tank, Anaerobic and Aerobic Tanks, Clarifier, Picket Fence Thickener, Dissolved Air Flotation (DAF) Plant, Pumping Station, Control Room, Filters and Concrete Plinths. The propoAs published by the register.
- Site area
- 12.03 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 8 · 500 m · 5 years
- OpenLoughaderry, Castlemartyr, Cork, P25YY58
- GrantedLoughaderry, Castlemartyr, Co. Cork, P25 YW44
- WithdrawnLoughaderry, Castlemartyr, Co. Cork, P25 YW44
- CommencedLoughaderry Castlemartyr Co.Cork
- GrantedCurragrine Castlemartyr Co. Cork
- WithdrawnCurragrine Castlemartyr Co. Cork
- GrantedLoughaderry Castlemartyr Co. Cork
- GrantedLoughaderry Castlemartyr Co. Cork
Building started
- 8 May 2019 · Builder told the council work was starting CN0051206CC
- 14 Mar 2019 · Builder told the council work was starting CN0049267CC
- 26 Feb 2019 · Builder told the council work was starting CN0048637CC
- 30 Jan 2019 · Builder told the council work was starting CN0047758CC
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
- NIAH-recorded building · 12
- Recorded monument · 22
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
16/7031 is a planning application to Cork County Council for to construct new cheese production facility and a significant upgrade of the existing, received on 8 Dec 2016; permission was granted with conditions on 4 Aug 2017.