Annabella West End Mallow Co. Cork
Approved in Nov 2018. The approval ran out in 2023.
- 17 Apr 2018Received
- 23 Oct 2018Conditional
- 29 Nov 2018Final approval
- 29 Nov 2023Approval ran out
Earlier approval here ran out with no sign of building: 16/6877 (2017)
- Status
- Approved
- Decision
- Conditional · 23 Oct 2018
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 6.42 ha
Live near Annabella West End Mallow Co. Cork?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
Construction of: new CIP (Cleaning in Place) Bund with 6 no. tanks containing cleaning products (Bund 38), new part six-storey part single storey Production Building (Building 50) with new product bund and 12 no. silos and 2 no. single storey valve control buildings, new tanker unloading bay (Building 51), new part six-storey, part two-storey, Intermediate Product Store/Packaging Building (Building 52) and 2 no. loading bays, new single storey Finished Product Store 1 (Building 53) and 7 no. loading bays, new single storey Finished Product Store 2 (Building 54) and 6 no. loading bays, elevated visitor and operator access walkway from new laboratories and production building to the existing dryer and evaporator buildings, Relocation of existing Truck Washing Station, associated pipe racking, silos, compactor, signage and site works, new single storey Staff Entrance to existing Production Building 18, Alterations to and change of use of the existing Engineering Workshop and Stores Building to include new offices and laboratories and 2 no new loading bays (Building 04), Demolition of existing disused Garage (Building 27) and existing storage facility and loading bays (Buildings 05 and 20), The application relates to an establishment which has an Industrial Emissions Licence (P0403-03).The EIAR and the NIS will be submitted to the Planning Authority with the Application
Planning details
- Reference
- 18/4946
- Local authority
- Cork County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 17 Apr 2018
- Observations close
- 22 May 2018 (closed 3075 days ago)
- Decision due
- 24 Oct 2018 · decided 23 Oct 2018
- Decision
- Conditional on 23 Oct 2018
- Site area
- 6.42 ha from the mapped boundary, not the council's figure
Nearby 47 · 500 m · 5 years
- GrantedNo.14 Deal Yard Lane, Mallow, Co. Cork, P51H266
- GrantedWest End And Park Road, Annabella, Mallow, Co.Cork
- Refused34 Bank Place,, Mallow,, Co. Cork, P51 ED8W
- Withdrawn34 Bank Place, Mallow, Co. Cork, P51 ED8W
- GrantedCo-Op Store West End and Park Road Annabella Mallow, Co. Cork
- RefusedAnnabella Mallow Co.Cork
- CommencedLackanalooha Mallow Co.Cork
- CommencedThe Rear of no. 26 Bank Place Thomas Davis Street Mallow Co.Cork
Show all 47
- Granted10 Lower Beecher Street Kilknockan Mallow Co.Cork
- Granted51 Beecher Street Lackanalooha Mallow Co. Cork
- GrantedHibernian Way Mallow Co.Cork
- CommencedNo.31 Beecher Street Kilknockan Mallow Co.Cork
- WithdrawnHibernian Way Mallow Co.Cork
- GrantedAnnabella Mallow Co Cork
- WithdrawnHibernian Way Mallow Co.Cork
- CommencedThe Mallow South Town Centre Development, (under construction), bounded by West End & Park Road, Annabella, Mallow, Co. Cork.
- GrantedAnnabella, West End & Park Road (N72), Mallow, Co. Cork.
- WithdrawnWest End & Park Road (N72) Annabella Mallow co.Cork
- Commenced5 Springwood Annabella Mallow Co. Cork
- Withdrawn5 Springwood Annabella Mallow co.Cork
- GrantedAnnabella Mallow Co Cork
- Withdrawn5 Springwood Annabella Mallow Co Cork
- WithdrawnDairygold Mallow Annabella Mallow Co Cork
- GrantedLeadon Navigation Road Annabella Mallow Co Cork
- RefusedBank Of Ireland, 150 Bank Place Main Street Mallow Co. Cork
- WithdrawnAnnabella Mallow Co Cork
- GrantedBowling Green Mallow Co.Cork
- WithdrawnAnnabella Mallow Co Cork
- Granted4 Shortcastle Street Mallow Co Cork
- Granted51 Beecher Street Lackanalooha Mallow Co.Cork
- Withdrawn4 Shortcastle Street Mallow Co. Cork
- Refused5, 6 & 7 West End Mallow Co Cork
- CommencedWest End & Park Road Annabella, Castlelands Mallow Co.Cork
- Granted30 Glenanaar Row Mallow Co. Cork
- GrantedNo. 18 Thomas Davis Street Mallow Co. Cork
- GrantedNos. 144A and 144B (McDonald's Restaurant) Bank Place Thomas Davis Street Mallow, Co. Cork
- Granted20 Lacknalooha Lackanalooha Mallow Co Cork
- Withdrawn30 Glenanaar Row Mallow Co.Cork
- WithdrawnFairyhill Nursing Home Kennell Hill Annabella Mallow, Co. Cork
- Granted142/143 Bank Place Thomas Davis Street and Hibernian Way Mallow, Co. Cork
- Withdrawn142/143 Bank Place, Thomas Davis Street, Hibernian Way, Mallow Co.Cork
- Withdrawn142/143 Bank Place, Thomas Davis Street Hibernian Way Mallow Co. Cork
- Granted15 and 16 West End Thomas Davis Street Mallow Co. Cork
- Granted6 Lower Beecher Street Lackanalooha, Mallow Co. Cork
- Withdrawn6 Lower Beecher Street Lackanalooha Mallow Co Cork
- GrantedEmmet Street Mallow Co.Cork
- CommencedLeaselands Mallow Co. Cork
Homes nearby
- For sale6 Humes Lane, West End, Mallow, Co. Cork, P51 Y3CE
- For sale9 Bowling Court, Mallow, Co. Cork, P51 H028
- For sale28 The Elms, Mallow, Co. Cork, P51 H0XF
- For sale29 Lisheen Row, Mallow, Co. Cork, P51 F95H
- For saleLeadon, Navigation Road, Mallow, Co. Cork, P51 A400
- For sale2 Deal Yard Mews, Mallow, Co. Cork, P51 KH5V
Zoning
The main town centre — retail, offices, civic uses, apartments.
The main town centre — retail, offices, civic uses, apartments.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Protections nearby 250 m
- NIAH-recorded building · 56
- Recorded monument · 10
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
18/4946 is a planning application to Cork County Council for construction of: new CIP (Cleaning in Place) Bund with 6 no. tanks containing cleaning, received on 17 Apr 2018; permission was granted with conditions on 23 Oct 2018.