Aghada Ballincarroonig Whitegate Co. Cork
Approved in Dec 2018.
- 5 Nov 2018Received
- 20 Dec 2018Unconditional
Earlier approval here ran out with no sign of building: 13/6071 (2014)
- Status
- Approved
- Decision
- Unconditional · 20 Dec 2018
- Council
- Cork County Council
- Type
- EXTENSION OF DURATION
- Site
- 2.38 ha
Live near Aghada Ballincarroonig Whitegate Co.…?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
Alterations and improvements to the existing 220kV substation consisting of a single storey control building (approx 204 sqm and approx. 5.2 in height) located at the (rear) Southern corner of the existing substation; 11no. control and protection kiosks located adjacent to existing bays, each approx. 16 sqm and approx. 3.4m in height; 2no. lightning monopoles up to approx. 18m in height; a new wing coupler bay; new sectionaliser bay; new internal access road (approx. 5m carriageway width and 120m in length) running from the existing access road within Aghada electricity generating station along the South Western boundary of the substation; new perimeter vehicular gates at the Southern corner of the substation; associated modification to existing perimeter fence at the Southern corner of the substation, plus existing perimeter chain link fence to be replaced with new 2.6m high palisade fence, associated drainage to include foul holding tank, surface water soakpit, new watermain connection; and all associated site works. The development will also consist of alterations and improvements to the existing110 kV substation consisting of 1no. control and protection kiosk approx. 16sqm. and approx. 3.4m in height; 1no. lightening monopole up to approx 10m in height; upgrade of existing strung busbar to tubular busbar, extension of existing palisade fence around proposed lightening monopole and all associated site works. Extension of Duration of Permission granted under Planning Reference: 13/06071
Planning details
- Reference
- 18/6919
- Local authority
- Cork County Council
- Status
- Granted · register status “APPLICATION FINALISED”
- Received
- 5 Nov 2018
- Observations close
- 10 Dec 2018 (closed 2866 days ago)
- Decision due
- 8 Jan 2019 · decided 20 Dec 2018
- Decision
- Unconditional on 20 Dec 2018
- Site area
- 2.38 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 9 · 500 m · 5 years
- OpenThe townland of Ballincarroonig, Aghada, Co. Cork, within the wider ESB landholding
- WithdrawnThe townland of Ballincarroonig, Aghada, County Cork, within the wider ESB landholding
- GrantedESB Aghada Generating Station, Townlands of Ballincarroonig and Aghada, Aghada, Co. Cork, P25 XE94
- GrantedFairwinds, Hadwell Road, Lower Aghada, Whitegate, Co. Cork, P25H932
- WithdrawnFairwinds, Hadwell Road, Lower Aghada, Whitegate, Co. Cork, P25H932
- GrantedAghada Above Ground Installation (AGI) Ballincarroonig Aghada Co. Cork
- WithdrawnAghada AGI (Above Ground Installation) Ballincarroonig Aghada Co.Cork
- GrantedESB Aghada Generating Station Ballincarroonig Aghada Co Cork
Homes nearby
- For saleCareystown, Whitegate, Midleton, Co. Cork, P25 X0C7
- For sale10 Careystown Woods, Whitegate, Midleton, Co. Cork, P25 D450
- For saleMain Street, Whitegate, Co. Cork, P25 K6C8
- For saleHarbour Vista, Church Road, Aghada, Co. Cork, P25 FF83
- For saleChurch Road, Aghada, Co. Cork, P25 P295
- For saleSite Four, Harbours Edge, Aghada, Co. Cork
Zoning
Zoned for employment uses. Housing is not the intended use here.
Protections nearby 250 m
No mapped flood area nearby.
Nothing else protected nearby.
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
18/6919 is a planning application to Cork County Council for alterations and improvements to the existing 220kV substation consisting of a single, received on 5 Nov 2018; permission was granted on 20 Dec 2018.