PlanningRegister.ie
Cork County Council · 19/258

Lands at The Miles Clonakilty Co Cork

Approved. Building started.

  1. 18 Apr 2019Received
  2. 23 May 2019Observations closed
  3. 12 Jun 2019Decision due
  4. 6 Nov 2019Building started
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Building started
Decision
Due 12 Jun 2019
Council
Cork County Council
Type
PERMISSION
Site
4.25 ha

Live near Lands at The Miles Clonakilty Co Cork?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

Construction of (i) 93 no./ two storey dwellings (19 no. detached, 60 no. semi-detached & 14 no. terrace dwellings); each dwelling is served by a rear garden private amenity space and 2 no. on-curtilage parking spaces; (ii) provision of public open space (0.62 hectares/6,201 sq.m.) to serve the development; (iii) 278 sq.m. single storey crèche (ridge height 5.28m) with associated provision of 163 sq.m. of outdoor play area and 8 no. car parking spaces; (iv) attenuation tank and pumping station to serve surface water; (v) the development also includes 2 no. vehicular junctions on Miles Road to serve (a) 85 no. dwellings and (b) 8 no. dwellings; street lighting; internal roadways; footpaths; foul and SuDS surface drainage; landscaping/boundary treatments and all ancillary infrastructural and engineering works necessary to facilitate the development

Planning details

Reference
19/258
Local authority
Cork County Council
Status
Commenced · register status “INCOMPLETED APPLICATION”
Received
18 Apr 2019
Observations close
23 May 2019 (closed 2690 days ago)
Decision due
12 Jun 2019
Decision
Not decided
Proposed development
Construction of (i) 93 no./ two storey dwellings (19 no. detached, 60 no. semi-detached & 14 no. terrace dwellings); each dwelling is served by a rear garden private amenity space and 2 no. on-curtilage parking spaces; (ii) provision of public open space (0.62 hectares/6,201 sq.m.) to serve the development; (iii) 278 sq.m. single storey crèche (ridge height 5.28m) with associated provision of 163 sq.m. of outdoor play area and 8 no. car parking spaces; (iv) attenuation tank and pumping station to serve surface water; (v) the development also includes 2 no. vehicular junctions on Miles Road to serve (a) 85 no. dwellings and (b) 8 no. dwellings; street lighting; internal roadways; footpaths; foul and SuDS surface drainage; landscaping/boundary treatments and all ancillary infrastructural and engineering works necessary to facilitate the development
As published by the register.
Site area
4.25 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 26 · 500 m · 5 years

Show all 26

Explore this area on the map →

Homes nearby

Building started

  • 14 Mar 2020 · Builder told the council work was starting CN0062536LS
  • 9 Mar 2020 · Builder told the council work was starting (opted out of the finish sign-off) CN0062323CW
  • 6 Nov 2019 · Builder told the council work was starting CN0058793KE

Zoning

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

No mapped flood area nearby.

  • Recorded monument · 7
    Enclosure; Souterrain

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open
Summary

19/258 is a planning application to Cork County Council for construction of (i) 93 no./ two storey dwellings (19 no. detached, 60 no. semi-detached, received on 18 Apr 2019; the file is recorded as incompleted application.