Cork County Council · 19/5411

Aghada Generating Station Ballincarroonig Aghada Whitegate, Co. Cork

Approved in 2019. Approval ran out in 2024.

  1. 30 May 2019Received
  2. 2 Oct 2019Conditional
  3. 12 Nov 2019Final approval
  4. 12 Nov 2024Approval ran out

Earlier approval here ran out with no sign of building: 18/5659 (2018)

Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Approved
Decision
Conditional · 2 Oct 2019
Council
Cork County Council
Type
PERMISSION
Site
1.81 ha

Live near Aghada Generating Station…?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

A 55 MWe (electrical output) aero derivative gas fired turbine, including the following elements: (a) 1 No. Turbine module (c.535 sq.m., c.15.2m high) in a fully enclosed weatherproof acoustic enclosure including a c.30m high stack, selective catalytic reduction (SCR), gas turbine and air intake; (b) supporting items of plant including: step up transformer with firewall (c.192 sq. m.); bunded station service transformer (c.11 sq. m.); single storey control/electrical room (c.150 sq. m.); bunded ammonia storage tank (c.20 sq. m.); gas compressor (c.128 sq. m); gas compressor cooler (c.28 sq. m.); single storey building containing a fire suppression system and gas bottle storage (c.79 sq. m.); fin fan coolers (c.53 sq. m.); lube oil skid (c.32 sq. m.); fenced gas receiving station (c.11 sq. m.); (c) external service areas including a maintenance laydown area and an ammonia unloading area; (d) connections to existing site services networks including: gas, liquid fuel, electrical, water, wastewater, and an underground surface water attenuation tank connecting to surface water drains; (e) all other ancillary and miscellaneous site works including site clearance; site access and a temporary construction compound. Planning permission is being sought for a duration of 10 years. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency (EPA). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. A 1.81 ha site located to the east of the R630; located inside the Aghada Generating Station, which is licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence [Ref.P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015

Planning details

Reference
19/5411
Local authority
Cork County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
30 May 2019
Observations close
4 Jul 2019 (closed 2653 days ago)
Decision due
3 Oct 2019 · decided 2 Oct 2019
Decision
Conditional on 2 Oct 2019
Proposed development
A 55 MWe (electrical output) aero derivative gas fired turbine, including the following elements: (a) 1 No. Turbine module (c.535 sq.m., c.15.2m high) in a fully enclosed weatherproof acoustic enclosure including a c.30m high stack, selective catalytic reduction (SCR), gas turbine and air intake; (b) supporting items of plant including: step up transformer with firewall (c.192 sq. m.); bunded station service transformer (c.11 sq. m.); single storey control/electrical room (c.150 sq. m.); bunded ammonia storage tank (c.20 sq. m.); gas compressor (c.128 sq. m); gas compressor cooler (c.28 sq. m.); single storey building containing a fire suppression system and gas bottle storage (c.79 sq. m.); fin fan coolers (c.53 sq. m.); lube oil skid (c.32 sq. m.); fenced gas receiving station (c.11 sq. m.); (c) external service areas including a maintenance laydown area and an ammonia unloading area; (d) connections to existing site services networks including: gas, liquid fuel, electrical, water, wastewater, and an underground surface water attenuation tank connecting to surface water drains; (e) all other ancillary and miscellaneous site works including site clearance; site access and a temporary construction compound. Planning permission is being sought for a duration of 10 years. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency (EPA). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. A 1.81 ha site located to the east of the R630; located inside the Aghada Generating Station, which is licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence [Ref.P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015
As published by the register.
Site area
1.81 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 8 · 500 m · 5 years

Explore this area on the map →

Homes nearby

Zoning

C2.1 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

Protections nearby 250 m

No mapped flood area nearby.

  • NIAH-recorded building · 1
    Aghada Generating Station
  • Recorded monument · 2
    Burial ground; R130207

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open
Summary

19/5411 is a planning application to Cork County Council for a 55 MWe (electrical output) aero derivative gas fired turbine, including the following, received on 30 May 2019; permission was granted with conditions on 2 Oct 2019.