Kerrygold Park Mitchelstown Co. Cork
Approved in 2021. Approval ran out in 2026.
- 2 Mar 2021Received
- 24 Jun 2021Conditional
- 24 Jun 2026Approval ran out
Earlier approval here ran out with no sign of building: 19/6855 (2020), 14/5908 (2014)
- Status
- Approved
- Decision
- Conditional · 24 Jun 2021
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 2.61 ha
Live near Kerrygold Park Mitchelstown Co. Cork?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
An extension (4364m2) to the existing Butter Processing Facility (6146m2) for the manufacture, packaging and distribution of Butter products permitted by Cork County Council planning application references 145908 & 196855. The proposal will comprise: extensions adjoining the main building ranging from c.9.35m to 18.85m in height consisting of; c.330m2 of office/ancillary accommodation arranged over two storeys, c.1,219m2 of ground floor production space, with c. 331m2 of first floor / mezzanine production space, c.1,987m2 of single storey storage/distribution space, enclosed plant space c.118m2 with open plant area above of c. 7m in height and a single storey liquid ingredients intake building extension c.68m2 with open plant area above of c. 9.5m in height. 7 no. new liquid storage silos of c.15 m in height with associated access platforms. A new single storey maintenance store c. 103m2 of c.5.5m in height. A new enclosure for existing wastewater pre-treatment equipment c.112m2 of c. 4.0m in height. A new enclosure to the existing process water storage tank of c.96m2 of c. 5.5m in height. Relocation of existing liquid storage unit. Existing external signage relocated on western elevation. 36 no. new car parking spaces in a new parking area containing 72 space of which 36 are displaced by the proposed extension, 17 no. new bicycle parking spaces, 4 no. new motorcycle parking spaces. Landscaping, hardstandings, underground services and ancillary works. All on site area of 2.62 Ha. All access to and from the site will remain by way of the existing access road to Castlefarm from the N73 (Kildorrery) roundabout. The application relates to a development which is located on a site which operates under Industrial Emissions License P0404-02. The environmental Impact Assessment Report and Natura Impact Statement will be submitted to the Planning Authority with the application
Planning details
- Reference
- 21/4516
- Local authority
- Cork County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 2 Mar 2021
- Observations close
- 6 Apr 2021 (closed 2009 days ago)
- Decision due
- 6 Jul 2021 · decided 24 Jun 2021
- Decision
- Conditional on 24 Jun 2021
- Proposed development
- An extension (4364m2) to the existing Butter Processing Facility (6146m2) for the manufacture, packaging and distribution of Butter products permitted by Cork County Council planning application references 145908 & 196855. The proposal will comprise: extensions adjoining the main building ranging from c.9.35m to 18.85m in height consisting of; c.330m2 of office/ancillary accommodation arranged over two storeys, c.1,219m2 of ground floor production space, with c. 331m2 of first floor / mezzanine production space, c.1,987m2 of single storey storage/distribution space, enclosed plant space c.118m2 with open plant area above of c. 7m in height and a single storey liquid ingredients intake building extension c.68m2 with open plant area above of c. 9.5m in height. 7 no. new liquid storage silos of c.15 m in height with associated access platforms. A new single storey maintenance store c. 103m2 of c.5.5m in height. A new enclosure for existing wastewater pre-treatment equipment c.112m2 of c. 4.0m in height. A new enclosure to the existing process water storage tank of c.96m2 of c. 5.5m in height. Relocation of existing liquid storage unit. Existing external signage relocated on western elevation. 36 no. new car parking spaces in a new parking area containing 72 space of which 36 are displaced by the proposed extension, 17 no. new bicycle parking spaces, 4 no. new motorcycle parking spaces. Landscaping, hardstandings, underground services and ancillary works. All on site area of 2.62 Ha. All access to and from the site will remain by way of the existing access road to Castlefarm from the N73 (Kildorrery) roundabout. The application relates to a development which is located on a site which operates under Industrial Emissions License P0404-02. The environmental Impact Assessment Report and Natura Impact Statement will be submitted to the Planning Authority with the applicationAs published by the register.
- Site area
- 2.61 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 5 · 500 m · 5 years
Homes nearby
- For sale11 King Street, Mitchelstown, Co. Cork, P67 DK29
- For saleGround floor Apartment at No 11 King Street, Mitchelstown, Co. Cork, P67 DK29
- For saleThomas Street, Mitchelstown, Co. Cork, P67 XY03
- For saleBaldwin Street, Mitchelstown, Co. Cork, P67 WY20
- For saleCarrigbán, Curraghavoe, Mitchelstown, Co. Cork
- For salec.53 acres Forrest, Rearoe, Clogheen near, Mitchelstown, Co. Cork
- For saleGaltymore, Skeheenarinky near, Mitchelstown, Co. Cork
- For sale3 Dún Rí, Barrack Road, Mitchelstown, Co. Cork, P67 NA06
- For sale22 x Apartments, Carriagroe, Brigown, Mitchelstown, Co. Cork, P67 F763
- WithdrawnGeorges Street, Mitchelstown, Co. Cork, P67 RK51
- WithdrawnKing Square, Mitchelstown, Co. Cork., Co. Cork
- Withdrawn1 King Street, Mitchelstown, Co. Cork, P67 N290
Zoning
Zoned for employment uses. Housing is not the intended use here.
The main town centre — retail, offices, civic uses, apartments.
Protections nearby 250 m
No mapped flood area nearby.
- NIAH-recorded building · 3
- Recorded monument · 7
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
21/4516 is a planning application to Cork County Council for an extension (4364m2) to the existing Butter Processing Facility (6146m2) for the, received on 2 Mar 2021; permission was granted with conditions on 24 Jun 2021.