Classes Ballincollig Co. Cork
- 18 Jun 2021Received
- 14 Dec 2021Conditional
- 25 Jan 2022Final grant
- Status
- Granted with conditions
- Decision
- Conditional · 14 Dec 2021
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 1.31 ha
What’s proposed
A 10 year permission for a 20kV overground and underground grid connection cable of 1.26km in length (of which c.0.43 km is located in the administrative area of Cork County and 0.83 km is located in the administrative area of Cork City) to be provided on overhead poles and in excavated trenches and include associated underground ducting and all associated site development and reinstatement works. The proposed grid connection cable will connect the solar farm substation permitted under Cork County Council planning reference 18/7410 (An Bord Pleanála reference 304045-19) which is now located within the administrative area of Cork City, with the existing 110kV Coolroe substation. The works will be carried out on private lands and within the public road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
21/5686 is a planning application to Cork County Council for a 10 year permission for a 20kV overground and underground grid connection cable of, received on 18 Jun 2021; permission was granted with conditions on 14 Dec 2021.
Planning details
- Reference
- 21/5686
- Local authority
- Cork County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 18 Jun 2021
- Observations close
- 23 Jul 2021 (closed 1890 days ago)
- Decision due
- 16 Dec 2021 · decided 14 Dec 2021
- Decision
- Conditional on 14 Dec 2021
- Proposed development
- A 10 year permission for a 20kV overground and underground grid connection cable of 1.26km in length (of which c.0.43 km is located in the administrative area of Cork County and 0.83 km is located in the administrative area of Cork City) to be provided on overhead poles and in excavated trenches and include associated underground ducting and all associated site development and reinstatement works. The proposed grid connection cable will connect the solar farm substation permitted under Cork County Council planning reference 18/7410 (An Bord Pleanála reference 304045-19) which is now located within the administrative area of Cork City, with the existing 110kV Coolroe substation. The works will be carried out on private lands and within the public road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the applicationAs published by the register.
- Site area
- 1.31 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 313147). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/corkcoco/application-details/?ref=21/5686.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |