Laharan West Boherbue Co.Cork
Approved in 2022. No sign of building yet.
- 21 Dec 2021Received
- 23 Feb 2022Conditional
- 29 Mar 2022Final approval
- 29 Mar 2027Approval runs out
- Status
- Approved
- Decision
- Conditional · 23 Feb 2022
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 2.93 ha
Live near Laharan West Boherbue Co.Cork?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
(1)Construction of new inlet works, new storm overflow and flow splitting chamber, new aeration tanks, new settlement tanks, and cloth filter structure, new storm tank, new sludge drying reed beds, new outfall pipeline together with associated tanks, chambers, pipelines, provisions of new admin and welfare modular kiosk, upgrade to boundary treatment to include 2.4m high weld mesh fence, new internal access road, public lighting and all associated site development works (2) Construction of new admin/welfare modular building. (3) decommissioning of the existing wastewater treatment plant, equipment and associated structures as part of the upgrade works. (4) Construction of 150kW photovoltaic (PV) solar panels on ground mounted frames on the south-east area of the site. The grid connected to PV panels will be arranged in 5 no. rows with an overall panel area of 745sqm approximately. Provision of a kiosk/modular unit for associated electrical equipment. (5) All associated site development works above and below ground
Planning details
- Reference
- 21/7443
- Local authority
- Cork County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 21 Dec 2021
- Observations close
- 3 Feb 2022 (closed 1702 days ago)
- Decision due
- 23 Feb 2022 · decided 23 Feb 2022
- Decision
- Conditional on 23 Feb 2022
- Proposed development
- (1)Construction of new inlet works, new storm overflow and flow splitting chamber, new aeration tanks, new settlement tanks, and cloth filter structure, new storm tank, new sludge drying reed beds, new outfall pipeline together with associated tanks, chambers, pipelines, provisions of new admin and welfare modular kiosk, upgrade to boundary treatment to include 2.4m high weld mesh fence, new internal access road, public lighting and all associated site development works (2) Construction of new admin/welfare modular building. (3) decommissioning of the existing wastewater treatment plant, equipment and associated structures as part of the upgrade works. (4) Construction of 150kW photovoltaic (PV) solar panels on ground mounted frames on the south-east area of the site. The grid connected to PV panels will be arranged in 5 no. rows with an overall panel area of 745sqm approximately. Provision of a kiosk/modular unit for associated electrical equipment. (5) All associated site development works above and below groundAs published by the register.
- Site area
- 2.93 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 14 · 500 m · 5 years
- OpenGneeves,, Boherbue,, Mallow, Co.Cork, P51 V3P1
- WithdrawnGneeves, Boherbue, Mallow, Co. Cork. P51 V3P1
- GrantedGneeves, Boherbue, Mallow, Co. Cork, P51V3P1
- GrantedLaharan West Gneeves Boherbue Mallow, Co. Cork
- WithdrawnLaharan West Gneeves Boherbue Mallow, Co. Cork
- WithdrawnLaharan West Gneeves Boherbue Mallow, co.Cork
- WithdrawnLaharan West Gneeves Boherbue, Mallow Co.Cork
- GrantedGneeves Boherbue Mallow Co Cork
Show all 14
Homes nearby
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
- Recorded monument · 2
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
21/7443 is a planning application to Cork County Council for (1)Construction of new inlet works, new storm overflow and flow splitting chamber, new, received on 21 Dec 2021; permission was granted with conditions on 23 Feb 2022.