PlanningRegister.ie
Cork County Council · 22/207

Gubbeen Schull Co. Cork

  1. 24 Mar 2022Received
  2. 28 Apr 2022Observations closed
  3. 13 Dec 2022Decision due
  4. 29 Dec 2024Commenced
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Commenced
Decision
Due 13 Dec 2022
Council
Cork County Council
Type
PERMISSION
Site
1.56 ha

What’s proposed

Permission for retention for the installed 12m Dia. X 4.27m high overground steel slurry tank constructed to the East of the existing farmyard complex and Planning Permission for an On-farm Biogas Plant consisting of the following works: (a) Construct New 600 cubic meter biogas plant constructed within the existing concrete slurry tank, raising the wall height of the existing concrete slurry tank and complete with concrete roof. (b) Installation of a 4m membrane dome cover onto the existing 12m Dia. Overground steel slurry tank, giving an overall tank height of 8.27m. (c) Containerised prefabricated office/control cabin to the North of the proposed new biogas plant. (d) All associated site works

22/207 is a planning application to Cork County Council for permission for retention for the installed 12m Dia. X 4.27m high overground steel slurry, received on 24 Mar 2022; the file is recorded as withdrawn.

Planning details

Reference
22/207
Local authority
Cork County Council
Status
Commenced · register status “WITHDRAWN”
Received
24 Mar 2022
Observations close
28 Apr 2022 (closed 1614 days ago)
Decision due
13 Dec 2022
Decision
Not decided
Proposed development
Permission for retention for the installed 12m Dia. X 4.27m high overground steel slurry tank constructed to the East of the existing farmyard complex and Planning Permission for an On-farm Biogas Plant consisting of the following works: (a) Construct New 600 cubic meter biogas plant constructed within the existing concrete slurry tank, raising the wall height of the existing concrete slurry tank and complete with concrete roof. (b) Installation of a 4m membrane dome cover onto the existing 12m Dia. Overground steel slurry tank, giving an overall tank height of 8.27m. (c) Containerised prefabricated office/control cabin to the North of the proposed new biogas plant. (d) All associated site works
As published by the register.
Site area
1.56 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 3 applications within 500 m in the last 5 years

Explore this area on the map →

Appeal

Not appealed.

Commencement

  • Opt out commencement notice CN0124343GY
    29 Dec 2024Monument Road, Galwaymatched by ref_other_la
  • Commencement notice CN0116652KY
    24 Jun 2024Kerry, V92 YK09matched by ref_other_la
  • Short commencement notice CN0100159TT
    8 May 2023Curraheenduff,, Coalbrook,, Tipperarymatched by ref_other_la
  • Opt out commencement notice CN0100165TT
    8 May 2023Curraheenduff, Coalbrook,, Tipperarymatched by ref_other_la
  • Short commencement notice CN0096762CW
    30 Dec 2022craans house, Ardattin, Carlowmatched by ref_other_la

Zoning at the site

G3 — High amenity

Greenbelt1: Discourage strongly new individual housing from being located within the greenbelts around the Main Towns.

Protected high-amenity landscape. Development is resisted to preserve the character of the area.

Designations within 250 m

No OPW flood extent nearby.

  • NIAH-recorded building · 1
    Gubben Cottage

Provenance

Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 315282). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/corkcoco/application-details/?ref=22/207.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open