Rathmore Baltimore Co. Cork
Approved in Mar 2023. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 10 Jun 2022Received
- 7 Feb 2023Conditional
- 13 Mar 2023Final approval
- 13 Mar 2028Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 7 Feb 2023
- Reference
- 22/395
- Received
- 10 Jun 2022
- Site
- 4,954 m²
What’s proposed
Refurbishment, alteration and extension of an existing dwelling house, the construction, alteration, reconstruction and extension of outbuildings to provide a home office and boat store and shed/garage, the demolition of an extension to the dwelling and of two sheds one of which is an open faced metal former hay barn, the construction of a new site vehicle entrance and driveway, and associated site works and services connections including a new foul treatment package and percolation area to replace an existing septic tank
1 other application within 500 m in the last year
Open the reportNearby 1 · 500 m · 12 months
Homes nearby
Protections nearby 250 m
- NIAH-recorded building · 2
- Recorded monument · 1
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
22/395 is a planning application to Cork County Council for refurbishment, alteration and extension of an existing dwelling house, the construction, received on 10 Jun 2022; permission was granted with conditions on 7 Feb 2023.