PlanningRegister.ie
Cork County Council · 22/4651

Tullagreen Carrigtwohill Co. Cork

Declared invalid.

  1. 25 Mar 2022Received
  2. 19 May 2022Decision due

Planning details

Status
Withdrawn or invalid
Decision
Due 19 May 2022
Reference
22/4651
Received
25 Mar 2022
Site
4,643 m²

What’s proposed

The demolition of existing switch room and an existing drum store and the construction of a new 3 storey manufacturing building to the east of the existing manufacturing building.

Show all

At ground floor level the new manufacturing building will comprise warehouse area with two loading docks, a main production area, changing facilities, entrance area, offices, circulation corridors, workshops and a quality control laboratory. First floor level will comprise laboratory accommodation, offices, meeting rooms, circulation corridors, mechanical and electrical plant rooms. Second floor level will comprise process, mechanical and electrical plantrooms and circulating corridors. Roof level will comprise double stacked air handling units, chillers, miscellaneous mechanical pipework and electrical cable tray on pipe bridge structures traversing the roof. The development will also consist of a new single storey drum storage building & a 2 storey central utilities building accommodating boilers, air compressors and electrical switch rooms. A pipe Rack structure will carry electrical cable tray and pipework between the main production building, the drum store, the central utilities building and a new wastewater treatment plant. External works will comprise: The provision of a new internal road serving the south side of the main production building and along the west side serving the new central utilities building and drum store. The hard-standing area between the drum store and central utilities building to accommodate a process regenerative thermal oxidiser accessible by a service road between CUB and drum store. The provision of a hard-standing area east of the drum store and central utilities building accommodating a replacement switch room, regenerative thermal oxidiser serving the WWTP, a fire water storage tank, a used pallet storage area, a pump house, a foam pump house and an area to locate emergency generators. The height of the existing fire water retention pond is to be increased by 500mm for increased capacity. An extension to the wastewater treatment plant serving the new development will comprise an electrical switch room building, multiple tanks and bunded areas to be located on the east side of the site. Expansion of the existing tank farm will comprise the installation of mechanical equipment and solvent recovery units, serviced by a new tanker loading bay. The provision of a new main electrical switch building adjacent to the existing security cabin…

Cut short by the council feed. Full text ↗

3 other applications within 500 m in the last year

Open the report

Nearby 3 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Zoning

C6 — Waterfront

Zoned for waterfront and harbour-related development.

Protections nearby 250 m

  • NIAH-recorded building · 4
    Tullagreen House; Slatty Bridge
  • Recorded monument · 2
    Country house; R178524
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

22/4651 is a planning application to Cork County Council for the demolition of existing switch room and an existing drum store and the construction, received on 25 Mar 2022; the file is recorded as incompleted application.