What’s proposed

Intend to apply for 10 year planning permission. Underground electricity grid connection cabling, substation and ancillary site works. The development will comprise (1) a grid connection consisting of medium voltage cables and ducting in a excavated trench with a total length of c.1194 meters which will be installed on private land and public roads (L-2216 & L-22161);

Show all

(2) control/switching substation consisting of either (i) single storey block building or (ii) 2 no. modular units; (3) cable beam over grange hill stream; (4) provision of ring main unit (RMU); (5) and all associated site development and reinstatement works. The proposed development includes minor revisions to the approved layout of the solar farm previously permitted under Cork County Council planning reference 18/5760 comprising omission of substation and satellite mast, and provision of the above referenced RMU, and the addition of a cable beam and underground cabling. The purpose of the proposed development is to connect the permitted solar farm under reference 18/5760 to the national grid at the existing Ballincollig 38Kv substation

  1. 15 Jul 2022Received
  2. 10 Nov 2022Conditional
  3. 13 Dec 2022Final approval
  4. 13 Dec 2032Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Conditional · 10 Nov 2022
Reference
22/5656
Received
15 Jul 2022
Site
2.11 ha

1 other application within 500 m in five years

Get the full report

Nearby 1 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • Recorded monument · 6
    Quarry; Fulacht fia
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

22/5656 is a planning application to Cork County Council for intend to apply for 10 year planning permission. Underground electricity grid connection, received on 15 Jul 2022; permission was granted with conditions on 10 Nov 2022.