Fiddane, Cooliney, Ballynoran, Coolcaum Ballyroe, Charleville Co. Cork
Withdrawn or invalid.
- 28 Jul 2022Received
- 1 Sept 2022Observations closed
- 21 Sept 2022Decision due
- Status
- Withdrawn or invalid
- Decision
- Due 21 Sept 2022
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 15.19 ha
What’s proposed
The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of overhead line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and two transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (Pl. Ref. 17/05799 & ABP-308846-20) to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork. The cables will be under public road and private lands. A Natura Impact Statement will be submitted to the Planning Authority with this application
Planning details
- Reference
- 22/5777
- Local authority
- Cork County Council
- Status
- Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
- Received
- 28 Jul 2022
- Observations close
- 1 Sept 2022 (closed 1497 days ago)
- Decision due
- 21 Sept 2022
- Decision
- Not decided
- Proposed development
- The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of overhead line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and two transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (Pl. Ref. 17/05799 & ABP-308846-20) to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork. The cables will be under public road and private lands. A Natura Impact Statement will be submitted to the Planning Authority with this applicationAs published by the register.
- Site area
- 15.19 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 9 · 500 m · 5 years
- GrantedCoolcaum Churchtown Mallow Co. Cork, P51TR63
- WithdrawnCoolcaum Churchtown Mallow Co. Cork
- GrantedFiddane, Cooliney Coolcaum, Ballynoran, Ballynadrideen Ardnageehy, Charleville Co. Cork
- GrantedCoolcaum Churchtown Mallow Co.Cork
- GrantedCoolcaum Churchtown Mallow Co.Cork
- GrantedThe Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork.
- GrantedCoolcaum Churchtown Mallow Co.Cork
- WithdrawnCoolcaum Churchtown Mallow Co. Cork
Homes nearby
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
- Recorded monument · 7
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
22/5777 is a planning application to Cork County Council for the installation of two 33kV electricity grid interconnectors with a combined total, received on 28 Jul 2022; the file is recorded as incompleted application.