Little Brook Gurranes Castletownshend Co. Cork
Approved in Feb 2023. Building started.
What’s proposed
Permission for retention of existing ground floor extension (16sqm), first floor extension (16sqm) and outhouse (22sqm). Planning permission for change of use of existing outhouse to study; construction of a single storey flat roof extension (5sqm); replacement of the existing outhouse flat roof with a pitched roof; alterations to the front, rear and side elevations including, new windows, doors and rooflights…
Show all
alteration of existing openings; internal alterations and renovations; new waste water treatment system; new ground source heat pump to the existing dwelling house and all associated site works
- 1 Dec 2022Received
- 2 Feb 2023Conditional
- 7 Mar 2023Final approval
- 25 Sept 2023Building started
Planning details
- Status
- Building started
- Decision
- Conditional · 2 Feb 2023
- Reference
- 22/739
- Received
- 1 Dec 2022
- Site
- 4,035 m²
4 other applications within 500 m in five years
Get the full reportNearby 4 · 500 m · 5 years
Homes nearby
- For sale34 The Lawn, Castletownshend, Union Hall, Co. Cork, P81 R624
- For sale10 Saint Barrahane's Avenue, Castletownshend, Co. Cork, P81 AX58
- For sale4 Glenard, Castletownshend, Co. Cork, P81 RF86
- Withdrawn22 The Lawn, Castletownshend, Co. Cork, P81 ET61
- WithdrawnLil McCarthys, Main Street, Castletownshend, Co. Cork, P81 PX85
Building started
- 25 Sept 2023 · Builder told the council work was starting (opted out of the finish sign-off) CN0105632CC
Protections nearby 250 m
- NIAH-recorded building · 2
- Recorded monument · 12
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
22/739 is a planning application to Cork County Council for permission for retention of existing ground floor extension (16sqm), first floor, received on 1 Dec 2022; permission was granted with conditions on 2 Feb 2023.