Ballynoe Lombardstown Mallow Co. Cork
Approved in Feb 2024. No sign of building yet.
- 27 Feb 2023Received
- 18 Dec 2023Conditional
- 2 Feb 2024Final approval
- 2 Feb 2029Approval runs out
- Status
- Approved
- Decision
- Conditional · 18 Dec 2023
- Council
- Cork County Council
- Type
- PERMISSION
- Site
- 7,089 m²
Live near Ballynoe Lombardstown Mallow Co. Cork?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
1) changes to the facades and roof structure of the existing dwelling; 2) construction of a new two storey extension: 3) construction of a new wastewater treatment unit and percolation area; 4) including all associated site works: all to the existing two storey detached house
Planning details
- Reference
- 23/4340
- Local authority
- Cork County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 27 Feb 2023
- Observations close
- 3 Apr 2023 (closed 1285 days ago)
- Decision due
- 18 Dec 2023 · decided 18 Dec 2023
- Decision
- Conditional on 18 Dec 2023
- Proposed development
- 1) changes to the facades and roof structure of the existing dwelling; 2) construction of a new two storey extension: 3) construction of a new wastewater treatment unit and percolation area; 4) including all associated site works: all to the existing two storey detached houseAs published by the register.
- Site area
- 7,089 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 1 · 500 m · 5 years
Homes nearby
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
Nothing else protected nearby.
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
23/4340 is a planning application to Cork County Council for 1) changes to the facades and roof structure of the existing dwelling; 2) construction, received on 27 Feb 2023; permission was granted with conditions on 18 Dec 2023.