Cork County Council · 23/5486

Rahanisky Killeendaniel Monard Co. Cork

Approved in Dec 2023. No sign of building yet.

  1. 21 Jul 2023Received
  2. 20 Dec 2023Conditional
  3. 20 Dec 2033Approval runs out
Status
Approved
Decision
Conditional · 20 Dec 2023
Council
Cork County Council
Type
PERMISSION
Site
61.08 ha

Live near Rahanisky Killeendaniel Monard Co. Cork?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

What’s proposed

In plain English

A solar farm and underground grid connection in Monard

The applicant wants to build a solar farm on a 61.08 hectare site. This includes installing solar panels, an electrical substation, and underground cables to connect to the grid.

  • Includes 330,200 square meters of solar panels on steel frames
  • Requires a new site entrance to the L6965 local road
  • Features 10 CCTV and lighting posts
  • Involves 4,449m of underground cabling along public roads
Written by AI from the council’s description

An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.

The council’s description

A 10-year permission and 40-year operation period for a Solar Farm and underground grid connection within an overall site area of 61.08 hectares. The solar farm consists of 330,200 square meters of solar photovoltaic panels on ground mounted steel frames; on-site electrical substation; electrical skids (containing inverters, transformers and switchgear); underground power and communication cables and ducts; boundary security fencing; new internal access tracks and associated drainage infrastructure; new site entrance to the L6965 local road; 10 no. CCTV/lighting posts and all associated site services and works. The development also includes underground grid connection, which is to be installed primarily within the L6965, L2951 and L2963 public roads, this includes the installation of 3 no. underground medium voltage electrical cables, 1 no. fibre communications cable, 2 no. joint bays and associated infrastructure to allow communications and connection between the proposed 38kV on-site substation and the Kilbarry 110kV Substation, Blackpool, Cork City. The total length of the cable is c.4,449m of which c.2,021m will be within the jurisdiction of Cork County Council and c.2,428m within the jurisdiction of Cork City Council. A concurrent planning application will be lodged with Cork City Council for the remainder of the underground cable along the public roads to allow connection to the Kilbarry 110kV Substation in Blackpool, Cork City under Section 34 of the Planning and Development Act 2000 (PDA)(as amended)

Planning details

Reference
23/5486
Local authority
Cork County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
21 Jul 2023
Observations close
25 Aug 2023 (closed 1148 days ago)
Decision due
21 Dec 2023 · decided 20 Dec 2023
Decision
Conditional on 20 Dec 2023
Site area
61.08 ha from the mapped boundary, not the council's figure

Nearby 1 · 500 m · 5 years

Explore this area on the map →

Homes nearby

Zoning

P5 — Rural and agricultural

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

M1 — Metro / rail economic corridor

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

Protections nearby 250 m

  • NIAH-recorded building · 1
    farm house
  • Recorded monument · 3
    Ringfort - rath; R112800

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

23/5486 is a planning application to Cork County Council for a 10-year permission and 40-year operation period for a Solar Farm and underground grid, received on 21 Jul 2023; permission was granted with conditions on 20 Dec 2023.