Cork County Council · 23/6017

Esk South Glannaharee West Co. Cork

Approved in Jun 2024. No sign of building yet.

  1. 6 Oct 2023Received
  2. 20 May 2024Conditional
  3. 21 Jun 2024Final approval
  4. 21 Jun 2034Approval runs out
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Approved
Decision
Conditional · 20 May 2024
Council
Cork County Council
Type
PERMISSION
Site
15.52 ha

Live near Esk South Glannaharee West Co. Cork?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

10 Year Planning permission for a solar array with a total area of circa 16 hectares. The development will consist of solar panels on ground mounted frames, 2 no. single storey control cabins with associated electrical transformer unit and hardstand areas, 1 no. ring main unit, underground cabling within the solar array site to connect solar array field parcels, 33kV underground grid connection cabling to the existing Bweeng 38kV substation (within Esk windfarm), security fencing, CCTV, access tracks (upgrade of existing and new), upgrades to existing agricultural field entrance on the L5258, landscaping and all associated ancillary apparatus and development works. Operational access will be via the entrance from the L5258. The solar array will connect to the national grid and will have an operational lifespan of 40 years. Planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application

Planning details

Reference
23/6017
Local authority
Cork County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
6 Oct 2023
Observations close
10 Nov 2023 (closed 1064 days ago)
Decision due
20 May 2024 · decided 20 May 2024
Decision
Conditional on 20 May 2024
Proposed development
10 Year Planning permission for a solar array with a total area of circa 16 hectares. The development will consist of solar panels on ground mounted frames, 2 no. single storey control cabins with associated electrical transformer unit and hardstand areas, 1 no. ring main unit, underground cabling within the solar array site to connect solar array field parcels, 33kV underground grid connection cabling to the existing Bweeng 38kV substation (within Esk windfarm), security fencing, CCTV, access tracks (upgrade of existing and new), upgrades to existing agricultural field entrance on the L5258, landscaping and all associated ancillary apparatus and development works. Operational access will be via the entrance from the L5258. The solar array will connect to the national grid and will have an operational lifespan of 40 years. Planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application
As published by the register.
Site area
15.52 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby none · 500 m · 5 years

No other application within 500 m in the last 5 years.

Explore this area on the map →

Zoning

Not zoned in the current plan.

Protections nearby 250 m

No mapped flood area nearby.

  • Recorded monument · 2
    House - vernacular house; R179387

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open
Summary

23/6017 is a planning application to Cork County Council for 10 Year Planning permission for a solar array with a total area of circa 16 hectares., received on 6 Oct 2023; permission was granted with conditions on 20 May 2024.