Approved in Jul 2025. No sign of building yet.

  1. 11 Oct 2024Received
  2. 10 Jun 2025Conditional
  3. 15 Jul 2025Final approval
  4. 15 Jul 2030Approval runs out

Earlier approval here ran out with no sign of building: 18/4182 (2019)

Status
Approved
Decision
Conditional · 10 Jun 2025
Council
Cork County Council
Type
PERMISSION
Site
2.92 ha

Live near Caherdowney Millstreet Co. Cork?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

What’s proposed

Permission is sought for a battery energy storage system which will comprise of up to 15 no. BESS units comprising of battery cells within modules stored in racks on concrete bases and ancillary equipment (4 no. BESS containers within each BESS unit); an individual unit transformer at each BESS unit with some additional ancillary equipment, a transformer compound, control building (including control room and switch room), interface kiosk and all associated electrical infrastructure equipment and works, attenuation drainage pond to southeast of the BESS site, a temporary site compound and all associated works(to be located to the south of the BESS site); upgrade of existing vehicular access to local road and all associated internal access tracks, 2.4 metre high chain link fencing and associated landscaping along the perimeter of the development, 2.4m metre high palisade fencing along the perimeter of the transformer compound, associated electrical underground cabling and ducting works facilitating the connection of the proposed site to the Ballyvouskill transmission station, all associated site development, lighting, landscaping, CCTV, security fencing, boundary treatment works above and below ground and all associated ancillary infrastructure

Planning details

Reference
24/5910
Local authority
Cork County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
11 Oct 2024
Observations close
15 Nov 2024 (closed 704 days ago)
Decision due
10 Jun 2025 · decided 10 Jun 2025
Decision
Conditional on 10 Jun 2025
Site area
2.92 ha from the mapped boundary, not the council's figure

Nearby 1 · 500 m · 5 years

Explore this area on the map →

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

24/5910 is a planning application to Cork County Council for permission is sought for a battery energy storage system which will comprise of up to 15, received on 11 Oct 2024; permission was granted with conditions on 10 Jun 2025.