Aglish, Currahaly, Farnanes, Farran, Knockavullig Knocknagoul, Knockshanawee, Loughleigh Mahallagh, Nettleville Demesne, Rathonoane Rooves Beg, Rooves More, Shandangan East, Co. Cork
Refused in 2025.
- 15 Nov 2024Received
- 23 Jul 2025Refused
- Status
- Refused
- Decision
- Refused · 23 Jul 2025
- Council
- Cork County Council
- Type
- Permission
- Site
- 165.17 ha
What’s proposed
A 10 year Permission is sought for a solar farm with a total area of circa 161 hectares. The solar farm will consist of solar panels on ground mounted frames, 23 no. single storey electrical inverter/transformer stations, 6 no. single storey spare parts containers, 3 no. Ring Main Units, 7 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L62031, L6203, R619, L6207, L22012 and L2204 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 4 no. stream/drain deck crossings, 6 no. horizontal directional drill crossings ( under watercourse/drains/public road), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 7 no. entrances from L62031, L6203, L22012, L6398 and L2204 local roads. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration
Planning details
- Reference
- 24/6157
- Local authority
- Cork County Council
- Status
- Refused · register status “Awaiting Technical Validation”
- Received
- 15 Nov 2024
- Observations close
- 20 Dec 2024 (closed 657 days ago)
- Decision due
- 24 Jul 2025 · decided 23 Jul 2025
- Decision
- Refused on 23 Jul 2025
- Proposed development
- A 10 year Permission is sought for a solar farm with a total area of circa 161 hectares. The solar farm will consist of solar panels on ground mounted frames, 23 no. single storey electrical inverter/transformer stations, 6 no. single storey spare parts containers, 3 no. Ring Main Units, 7 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L62031, L6203, R619, L6207, L22012 and L2204 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 4 no. stream/drain deck crossings, 6 no. horizontal directional drill crossings ( under watercourse/drains/public road), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 7 no. entrances from L62031, L6203, L22012, L6398 and L2204 local roads. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this durationAs published by the register.
- Site area
- 165.17 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 · 500 m · 5 years
Homes nearby
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
- NIAH-recorded building · 2
- Recorded monument · 77
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
24/6157 is a planning application to Cork County Council for a 10 year Permission is sought for a solar farm with a total area of circa 161 hectares., received on 15 Nov 2024; permission was refused on 23 Jul 2025.