Knockroe Bandon Co. Cork
Approved in Feb 2026. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 14 Apr 2025Received
- 6 Feb 2026Approved
- 6 Feb 2031Approval runs out
Planning details
- Status
- Approved
- Decision
- Approved with conditions · 6 Feb 2026
- Reference
- 25/4666
- Received
- 14 Apr 2025
- Site
- 3.98 ha
What’s proposed
Permission for extraction of sand & gravel over an area c3.5 ha; extraction by dry working to a level 2 metres above ground water level at a maximum rate of 100,000 tonnes per year; transport of the extracted sand & gravel to the adjacent Dromkeen pit (plan ref. 23/04780) for use in concrete production; upgrading of the existing internal access road and use of the existing access onto the local road L3204; provision…
Show all
of wheelwash and welfare unit (c8.3sqm) and restoration of the lands to agricultural and natural habitat use, all within an application area of c4.0 hectares. Permission is sought for 15 years plus two years for final restoration (total duration of seventeen years). The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR)
1 other application within 500 m in the last year
Open the reportNearby 1 · 500 m · 12 months
Homes nearby
Protections nearby 250 m
- Recorded monument · 2
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
25/4666 is a planning application to Cork County Council for permission for extraction of sand & gravel over an area c3.5 ha; extraction by dry, received on 14 Apr 2025; permission was granted with conditions on 6 Feb 2026.