Inchera Little Island Co.Cork
Approved in 2025. No sign of building yet.
- 3 Jun 2025Received
- 24 Jul 2025Approved
- 29 Aug 2025Final approval
- 29 Aug 2030Approval runs out
Earlier approval here ran out with no sign of building: 15/4926 (2015)
- Status
- Approved
- Decision
- Approved with conditions · 24 Jul 2025
- Council
- Cork County Council
- Type
- Permission
- Site
- 2.01 ha
Live near Inchera Little Island Co.Cork?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as permitted by extant planning permission ref. 15/4926, extended by ref 20/5549 and amended by ref 23/5586. All demolition, site clearance, earthworks and formation for foundations will be complete under the current permission. The proposed plant will generate renewable biogas from 90,000 tonnes of non-hazardous biodegradable waste (‘Brown bin’ domestic and commercial waste) per annum utilising anaerobic digestion (AD) technology. It is proposed to upgrade the biogas to biomethane and inject it into the adjacent gas grid to replace fossil fuel derived natural gas. Other products from the process include digestate (a nutrient rich biofertilizer) as well as biogenic (natural) carbon dioxide. The proposed development will consist of the construction of: 1) main process building (c.3,762m2 gross floor area (GFA), max 14.5m high) incorporating feedstock reception and processing area, digestate treatment areas, dewatering and storage areas, quarantine areas, an odour control system and associated 25m high stack with signage on the south elevation. 2)Tank farm (c. 3,183m3 footprint, 4m high bund wall) encompassing a total of 6 tanks including four digestor tanks (20.15m max. height, c.3,400m3 capacity) a digestate storage tank (20.15m max. height, c.3,400m3 capacity), a suspension buffer tank ( 10.5m max.height, c.700m3 capacity (, an containerised desulphurisation plant and associated 2 tanks (14m max height, c120m3 capacity), 2 no. enclosed pump rooms (room no.1 -53.58m2 GFA and room no.2 – 23.69m2 GFA), and enclosed feedstock pump room (53.58m2 GFA and 3.6m high), 3 sediment settlement tanks (c.5.84(L), c.2.23m (W) & c.3.78(H) on a raised platform at 6m above ground level, stairwells, pumps, gantry walkways, 2 bund access stairs and tank emergency access ladders; 3) A biogas upgrade plant and gas entry unit; 1 no. containerised Combined Heat and Power (CHP) 1.5MW unit with an associated 28m high stack, a carbon dioxide liquefaction plant, a biogas holder (10.56 max. height, c.2,000m3) with 4 no. c.13.12m high lightning rods, a 9.26m gas flare, a containerised boiler with 10m stack, a transformer station, a propane storage tank, an emergency generator, 2 no. weighbridges, weighbridge office (c.17.2m2 GFA and 4.55m high), a fire water tank (c.1,000m3 and 14.12m high), a bunded vehicle refuelling area with a fuel storage tank (2.5m3) and a wheel wash, 4) Administration building (c.393.25m2 GFA) and a workshop (c.70m2 GFA), 5) 31 car parking spaces (including 2 electric vehicle charging points and a universal parking space), 2 motorcycle parking spaces and a covered bicycle rack; 6) Boundary treatment including 2.4m high perimeter fencing (mix of mesh wire fencing and acoustic fencing), access gates on the south western and north eastern boundaries; and 7) all ancillary site development works and services including landscaping, lighting, 2 no. directional signs, service yard area and internal circulation routes, pipe bridge, footpath and all site drainage works. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, reg. no. P1018-01. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the application
Planning details
- Reference
- 25/5034
- Local authority
- Cork County Council
- Status
- Granted with conditions · register status “Application Closed”
- Received
- 3 Jun 2025
- Observations close
- 8 Jul 2025 (closed 451 days ago)
- Decision due
- 24 Jul 2025 · decided 24 Jul 2025
- Decision
- Conditional permission on 24 Jul 2025
- Proposed development
- Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as permitted by extant planning permission ref. 15/4926, extended by ref 20/5549 and amended by ref 23/5586. All demolition, site clearance, earthworks and formation for foundations will be complete under the current permission. The proposed plant will generate renewable biogas from 90,000 tonnes of non-hazardous biodegradable waste (‘Brown bin’ domestic and commercial waste) per annum utilising anaerobic digestion (AD) technology. It is proposed to upgrade the biogas to biomethane and inject it into the adjacent gas grid to replace fossil fuel derived natural gas. Other products from the process include digestate (a nutrient rich biofertilizer) as well as biogenic (natural) carbon dioxide. The proposed development will consist of the construction of: 1) main process building (c.3,762m2 gross floor area (GFA), max 14.5m high) incorporating feedstock reception and processing area, digestate treatment areas, dewatering and storage areas, quarantine areas, an odour control system and associated 25m high stack with signage on the south elevation. 2)Tank farm (c. 3,183m3 footprint, 4m high bund wall) encompassing a total of 6 tanks including four digestor tanks (20.15m max. height, c.3,400m3 capacity) a digestate storage tank (20.15m max. height, c.3,400m3 capacity), a suspension buffer tank ( 10.5m max.height, c.700m3 capacity (, an containerised desulphurisation plant and associated 2 tanks (14m max height, c120m3 capacity), 2 no. enclosed pump rooms (room no.1 -53.58m2 GFA and room no.2 – 23.69m2 GFA), and enclosed feedstock pump room (53.58m2 GFA and 3.6m high), 3 sediment settlement tanks (c.5.84(L), c.2.23m (W) & c.3.78(H) on a raised platform at 6m above ground level, stairwells, pumps, gantry walkways, 2 bund access stairs and tank emergency access ladders; 3) A biogas upgrade plant and gas entry unit; 1 no. containerised Combined Heat and Power (CHP) 1.5MW unit with an associated 28m high stack, a carbon dioxide liquefaction plant, a biogas holder (10.56 max. height, c.2,000m3) with 4 no. c.13.12m high lightning rods, a 9.26m gas flare, a containerised boiler with 10m stack, a transformer station, a propane storage tank, an emergency generator, 2 no. weighbridges, weighbridge office (c.17.2m2 GFA and 4.55m high), a fire water tank (c.1,000m3 and 14.12m high), a bunded vehicle refuelling area with a fuel storage tank (2.5m3) and a wheel wash, 4) Administration building (c.393.25m2 GFA) and a workshop (c.70m2 GFA), 5) 31 car parking spaces (including 2 electric vehicle charging points and a universal parking space), 2 motorcycle parking spaces and a covered bicycle rack; 6) Boundary treatment including 2.4m high perimeter fencing (mix of mesh wire fencing and acoustic fencing), access gates on the south western and north eastern boundaries; and 7) all ancillary site development works and services including landscaping, lighting, 2 no. directional signs, service yard area and internal circulation routes, pipe bridge, footpath and all site drainage works. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, reg. no. P1018-01. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the applicationAs published by the register.
- Site area
- 2.01 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 15 · 500 m · 5 years
- CommencedLittle Island Industrial Estate,, Wallingstown (townland), Little Island, Co, Cork
- CommencedInchera, Little Island, Co. Cork
- OpenInchera, Little Island, Co. Cork
- GrantedLittle Island Industrial Estate Wallingstown Little Island Co. Cork
- Granted'E-Park' the former Mitsui Denman Site Wallingstown and Inchera (townlands) Little Island Co. Cork
- Granted'E-Park' the former Mitsui Denman Site Wallingstown Little Island Co.Cork
- GrantedLittle Island Industrial Estate Wallingstown Little Island Co. Cork
- WithdrawnInchera Industrial Estate Inchera Little island Co.Cork
Show all 15
- WithdrawnInchera Industrial Estate Inchera Little Island Co Cork
- GrantedLittle Island Industrial Estate Wallingstown Little Island Co.Cork
- WithdrawnLittle Island Industrial Estate Wallingstown Little Island co.Cork
- GrantedInchera Little Island co.Cork
- GrantedLittle Island Industrial Estate Wallingstown Little Island Co.Cork
- GrantedInchera Little Island Co.Cork
- GrantedWallingstown Little Island Co.Cork
Homes nearby
- For saleSite at Chez Maurann, Ballyverry, Little Island, Co. Cork, T45 X031
- For saleShaleigh, 6 Tower Hill, Kilcoolishal, Glounthaune, Cork, T45 WV04
- For saleYellow Cottage, Kilcoolishal, Glounthaune, Co. Cork, T45 N960
- For sale21 Rockwood, Mahon, Co. Cork, T12 X32T
- For sale10 The Avenue, Woodville, Glanmire, Co. Cork, T45 Y897
- For saleDunkettle, Glanmire, Co. Cork
- For saleCaherlag, Glanmire, Co. Cork
- For sale10 Spring Hill, Ballinglanna, Glanmire, Co. Cork, T45 NY13
- Withdrawn58 Castle Meadows, Skehard Road, Blackrock, Co. Cork, T12 P20K
- Withdrawn622 The Kingfisher, The Sanctuary, Jacob'S Island, Mahon, Co. Cork, T12 AH66
Zoning
Zoned for waterfront and harbour-related development.
Protections nearby 250 m
No mapped flood area nearby.
Nothing else protected nearby.
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
25/5034 is a planning application to Cork County Council for permission for the proposed development will consist of the completion of the Renewable, received on 3 Jun 2025; permission was granted with conditions on 24 Jul 2025.