Piercetown, Riverstick, Co.Cork
- 23 Oct 2025Received
- 27 Nov 2025Observations closed
- 17 Dec 2025Decision due
- Status
- Withdrawn or invalid
- Decision
- Due 17 Dec 2025
- Council
- Cork County Council
- Type
- Permission
- Site
- 2.65 ha
What’s proposed
Permission for construction of a galvanised steel truss weather radar tower with a technical equipment room and a radome located at the top and an equipment room located at the base. A section of forestry will be felled to facilitate the structure, which will measure a total of 39m in height and 8m in diameter and will be located on a hardcore platform. The structure will be accessed via a new access road off the existing forest haul road which will be upgraded to a width of 3.8m where required. The development will also consist of the installation of a solar photovoltaic (PV) array consisting of 24 solar panels on a fixed ground-mounted frame, boundary treatment to define the site and secure the weather radar and all assocaited site works and services
25/6265 is a planning application to Cork County Council for permission for construction of a galvanised steel truss weather radar tower with a, received on 23 Oct 2025; the file is recorded as invalid - case closed.
Planning details
- Reference
- 25/6265
- Local authority
- Cork County Council
- Status
- Withdrawn or invalid · register status “Invalid - Case Closed”
- Received
- 23 Oct 2025
- Observations close
- 27 Nov 2025 (closed 296 days ago)
- Decision due
- 17 Dec 2025
- Decision
- Not decided
- Proposed development
- Permission for construction of a galvanised steel truss weather radar tower with a technical equipment room and a radome located at the top and an equipment room located at the base. A section of forestry will be felled to facilitate the structure, which will measure a total of 39m in height and 8m in diameter and will be located on a hardcore platform. The structure will be accessed via a new access road off the existing forest haul road which will be upgraded to a width of 3.8m where required. The development will also consist of the installation of a solar photovoltaic (PV) array consisting of 24 solar panels on a fixed ground-mounted frame, boundary treatment to define the site and secure the weather radar and all assocaited site works and servicesAs published by the register.
- Site area
- 2.65 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 318686). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/corkcoco/application-details/?ref=25/6265.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |